Project management method and project management system
AssigneeHitachi, Ltd.
InventorsDaijiro Murata, Chiaki Hirai, Yutaka Kudo, Yuji Inoya, Atsushi Mitomi
Life of this patent
Estimating the term…
Abstract
A method of managing a hierarchically structured project on a computer. The method defines each of subprojects composing the hierarchical structure, define each structure of the works composing each subproject, stores information about each work of the subproject, collects informations about the corresponding works among the subprojects selected by the user as a compound work, and displays the information about the work on the compound-work basis.
Claims10
A method of managing a hierarchically structured project on a computer, comprising the steps of:
- defining subprojects composing the hierarchical structure;
- defining each structure of works composing said subproject;
- storing information about each work of said subproject;
- collecting information of the corresponding works among the plurality of subprojects selected by a user as a compound work;
- and
- displaying the information of said works on a compound-work basis.
A method of displaying information of a hierarchically structured project composed of a plurality of subprojects, each of said subprojects being composed of a plurality of works, comprising the steps of:
- displaying a hierarchical structure of each project;
- specifying the subprojects selected by a user;
- reading information about the works of said specified subprojects from a table;
- specifying a corresponding relation of works among said specified subprojects, and collecting the related works as a compound work;
- displaying the read information about the works on the compound-work basis.
A system of managing a hierarchically structured project, comprising:
- project defining means for defining subprojects composing the hierarchical structure;
- WBS (Work Breakdown Structure) defining means for defining each structure of works composing said subproject;
- storage means for storing information about each work of said subproject;
- compound work generating means for collecting information about the corresponding works among the plurality of subprojects selected by the user as a compound work;
- and
- display means for displaying information about said works on the compound-work basis.
A program of displaying information of a hierarchically structure project composed of a plurality of subprojects, each of said subprojects being composed of a plurality of works, comprising codes for executing the following steps of:
- displaying a hierarchical structure of each project;
- specifying the subprojects selected by the user;
- reading the information about the works of said specified subproject from a table;
- specifying a corresponding relation of said works among said specified subprojects and collecting the related works as a compound work;
- and
- displaying the read information about said work on the compound-work basis.
Dependencies are inferred from the claim text.