# US 2002/0170391 A1 · Production of metal foams

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2002/0170391 A1
- Document ID: US20020170391A1
- Status: Published application
- Kind: A1
- Application number: 10/147,152
- Filed: 2002-05-16
- Published: 2002-11-21
- Earliest claimed: 2001-05-19
- Assignees: Goldschmidt GmbH
- Inventors: Wilfried Knott; Andreas Weier; Dagmar Windbiel
- Web page: https://patentgrep.com/patent/US20020170391A1

## CPC

- B22F 3/1112: {comprising hollow spheres or hollow fibres}
- B22F 3/1125: {involving a foaming process}
- B22F 3/1134: {Inorganic fillers (carbonaceous or paper filler B22F3/1121)}
- C22C 1/08: Alloys with open or closed pores
- C22C 1/083: {Foaming process in molten metal other than by powder metallurgy}
- B22F: WORKING METALLIC POWDER; MANUFACTURE OF ARTICLES FROM METALLIC POWDER; MAKING METALLIC POWDER (making alloys by powder metallurgy C22C); APPARATUS OR DEVICES SPECIALLY ADAPTED FOR METALLIC POWDER
- C22C: ALLOYS (treatment of alloys C21D, C22F)

## Abstract

The invention relates to a process for producing metal foams of controlled structure and to the metal bodies in foam form obtained in this way, wherein metals from group IB to VIIIB of the periodic system of the elements are added before and/or during the formation of the foam.

## Claims

### Claim 1

A process for producing a metal foam which comprises foaming a matrix comprising a metal or a metal alloy and a blowing agent in the presence of at least one Group IB to VIIIB metal or mixture of said metals, wherein said Group IB to VIIIB metal or mixture of said metals is added before or during the foaming step.

### Claim 2 (depends on 1)

The process according to claim 1, wherein the metal, the metal alloy, or the Group IB to VIIIB metal is in the form of a powder.

### Claim 3 (depends on 2)

The process according to claim 2 wherein the metal is aluminum powder.

### Claim 4 (depends on 1)

The process according to claim 1, wherein the blowing agent is a metal hydride and the Group IB to VIIIB metal is selected from the group consisting of titanium, copper, iron, vanadium, and a mixture of said metals.

### Claim 5 (depends on 4)

The process according to claim 4, wherein the metal hydride is magnesium hydride.

### Claim 6 (depends on 1)

The process according to claim 1, wherein the metal is a light metal.

### Claim 7 (depends on 1)

The process according to claim 1, wherein the Group IB to VIIIB metal or mixture of said metals are present in an amount from about 0.001% by weight to about 1% by weight, based upon the metal which is to be foamed.

### Claim 8 (depends on 7)

The process according to claim 7, wherein the amount is from about 0.01% by weight to about 0.1% by weight.

### Claim 9 (depends on 1)

The process according to claim 1, wherein the blowing agent is present in an amount from about 0.1% by weight to about 5% by weight, based upon the metal which is to be foamed.

### Claim 10 (depends on 1)

The process according to claim 1, wherein the blowing agent is magnesium hydride which is autocatalytically produced.

### Claim 11 (depends on 1)

The process according to claim 1, wherein the blowing agent is present in an amount from 0.1% to 5% by weight and the Group IB to VIIIB metal or mixture of said metals are present in an amount from 0.001% to 1% by weight, based upon the metal which is to be foamed.

### Claim 12 (depends on 1)

The process according to claim 1, wherein the foaming occurs by compacting the matrix comprising the metal or metal alloy powder and the blowing agent, placing the compacted matrix into a preform, and heating the perform to a temperature which is higher than the liquidus temperature of the metal or metal alloy and the decomposition temperature of the blowing agent.

### Claim 13 (depends on 1)

The process according to claim 1, wherein the matrix comprises a metal melt in which the blowing agent is a gas or a mixture of gases and is dissolved therein.

### Claim 14 (depends on 1)

The process according to claim 1, wherein the matrix comprises a metal melt and the blowing agent, in which the blowing agent has been stirred into the metal melt.

### Claim 15 (depends on 1)

The process according to claim 1, wherein the matrix is formed into a hollow sphere together with the Group IB to VIIIB metal or mixture or said metals and then scintered.

### Claim 16 (depends on 1)

The process according to claim 1, the matrix comprises a metal melt, in which the blowing agent is added, said matrix is infiltrated into a filler body, said filler body being removed after the melt has solidified and forming the solidified metal.

### Claim 17

A method for controlling the morphology of a metal foam in a foaming process which comprises adding a Group IB to VIIIB metal or a mixture of said metals before or during said foaming process.

### Claim 18

A method for increasing the efficiency of a process for foaming a metal, which utilizes a foaming agent, which comprises adding a Group IB to VIIIB metal to said process.

### Claim 19 (depends on 1)

A metal foam obtainable by the process according to claim 1.
