Integrated scheduler and material control system
OwnerMitchell Weiss, Douglas Lawson +3inventors
InventorsMitchell Weiss, Douglas Lawson, Thomas Mariano, Robert Gaskins, Namdar Bahri
Life of this patent
Estimating the term…
Loading patent…
OwnerMitchell Weiss, Douglas Lawson +3inventors
InventorsMitchell Weiss, Douglas Lawson, Thomas Mariano, Robert Gaskins, Namdar Bahri
Estimating the term…
An integrated scheduler/material control system that receives a plurality of material move requests and prioritizes these move requests according to a critical pick-up time associated with each move request. Using vehicle utilization data from the traffic management system, the integrated scheduler/material control system determines the number of move requests to be deferred to a later time period and then calculates the number of move requests to be executed in the current time period. The integrated scheduler/material control system then passes the move requests and the number of move requests to be executed to the traffic management system in the prioritized order.
A method for scheduling the pick-up and delivery of material in a predetermined time period for an automated material handling system having material transport vehicles, the method comprising:
An apparatus for scheduling a plurality of move requests, the apparatus comprising:
A method for scheduling the pick-up and delivery of material in an automated material handling system having material transport vehicles, the method comprising:
Dependencies are inferred from the claim text.