Sea dragon
OwnerRussell Robert Michel JR.inventor
Life of this patent
Estimating the term…
Loading patent…
OwnerRussell Robert Michel JR.inventor
Estimating the term…
This invention is simple in design, effective in functionality, cost effective and is vitally important and beneficial to the enviroment in saving our oceans, beaches, marine wildlife and to prevent ecological contamination. This oil spill recovery system is designed to boom, skim and vacuum the oil or hazardous spills from the surface of fresh or salt water in semi rough or calm seas. The system is designed to be towed through the water by two ships. For the purpose of towing the system, a steel cable will run through two straps on the front of each unit in the system and attach to each ship. Each unit will be attached together like a chain with a apron to contain the spill like a dam, to push and build an oil level by drawing the contamined water and directing the spill at a high rate of flow through each of the five ports on the front of each unit by gravity flow or by the vacuum system to tanks on a ship. The system can be used in shallow water right up to the shore line as well as out in open sea. The system is designed to be stored on a ship and can be rapidly deployed in various lengths as needed. The computer system on the ship will continuously monitor the progress during the clean up operation through various sensors mounted on each unit and can adjust or change the function of any individual unit as well as shut units off and on as needed. Each unit has built in airbags, an automatic height adjustment, a headboard and toe board each incorporated with built in lights for the system to be fully utilized for day or night use. The system's units are reusable and can be manufactured in a wide variety of sizes from stainless steel and available commerical electrical components. Each unit will be connected together by steel pin with an attached apron made of nylon corded reinforced rubber. The system's design is that each unit will be connected to a main vacuum hose as well as wiring for the computer on the back of each unit. All computer operations, wiring, vacuum hose and all connections will be run from a ship to each unit in the chain before system is to be deployed from ship for clean up operation.
Unit Design:
Toe Board:
Toe Board Air Bag. The toe Board is designed with an integrated airbag on the bottom of the toe board that works in conjunction with the hydraulic system to lift the weight of the oil and water on the toe board.
The Head Board:
Mercury Switch:
Water Box:
Hydraulic System:
Barrier Apron:
Air Bags:
Dependencies are inferred from the claim text.