# US 2002/0120662 A1 · Real time multi-task process and operating system

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2002/0120662 A1
- Document ID: US20020120662A1
- Status: Published application
- Kind: A1
- Application number: 09/995,821
- Filed: 2001-11-29
- Published: 2002-08-29
- Earliest claimed: 2000-12-21
- Assignees: Airbus France
- Inventors: Serge Goiffon
- Web page: https://patentgrep.com/patent/US20020120662A1

## CPC

- G06F 9/4843: {by program, e.g. task dispatcher, supervisor, operating system}
- G06F 11/3419: {by assessing time}
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)

## Abstract

The invention concerns a real time multi-task operating process in which a set of observation windows of a fixed parameterizable duration are defined including: an allocation stage of a maximum execution duration for each task in each observation window during which a scheduler guarantees a minimum execution time for tasks with lower priority. A calculation stage for the time consumed by each task during each observation window A sanction stage during which the tasks which exceed their quota in a given observation window are sanctioned and can only regain the central unit resource during the following observation window. The invention also concerns a real time multi-task operating system.

## Claims

### Claim 1

Real time multi-task operating process in which a set of fixed duration parameterisable observation windows characterised by the fact that it includes:
an allocation stage of a maximum execution duration for each task in each observation window during which a scheduler guarantees a minimum execution time for the lower priority tasks
a calculation time for the time sent by each task during each observation window
a sanction stage during which the tasks which exceed their quota in a given observation window are sanctioned and can only return to the central resource unit during the following observation window

### Claim 2 (depends on 1)

Process according to claim 1 in which during the calculation stage a value supplied by a global software counter is used which is refined by adding to it the time passed since the last clock pulse read at one go in a material counter

### Claim 3 (depends on 1)

Process according to claim 1 including a rerouting stage: a first rerouting point existing in the scheduling code, a second rerouting point existing in the clock pulse process interruption programme; the latter, with a higher priority than all the system tasks enabling the calculation of the time spent by the task in progress and to sanction it if its quota is exceeded.

### Claim 4 (depends on 1)

Process according to claim 1 in which the sanction stage takes place during a task change.

### Claim 5 (depends on 1)

Process according to claim 1 in which the sanction stage takes place during the generation of a clock pulse.

### Claim 6 (depends on 1)

Process according to claim 1 in which the sanction stage consists of a reduction in task priority, a stoppage or destruction of the task.

### Claim 7 (depends on 1)

Process according to claim 1 including a start-up in which:
rerouting procedures are started
a supervision task is launched
the duration of the observation window is configured

### Claim 8 (depends on 7)

Process according to claim 7 including a task management stage in which:
during the creation of a task:
the maximum use duration of the central resource unit in the observation window and the sanction to be applied in the event of overshoot is configured
the surveillance of this task is launched
during the termination of this task the surveillance of the latter is inhibited
during the switching of this outgoing task to another entering task:
the event is dated
starting time of the entering task is recorded
the time spent by the outgoing task during the observation window
a sanction is applied if the time spent by the outgoing task is longer than the maximum allocated time

### Claim 9 (depends on 7)

Process according to claim 7 including a clock impulse management stage in which:
a sanction is applied if the time spent is longer than the maximum allocated time.

### Claim 10 (depends on 7)

Process according to claim 7 including an observation window management stage in which:
at the beginning of the window the time spent for the tasks is put at zero
at the end of the window the sanctioned tasks are rehabilitated

### Claim 11

Real time multi-task operating system characterised by the fact that it includes a surveillance module (32) which contains the code of a rerouting procedure for putting in place rerouting points, a functions interface accessible by a supervision task (30), a time management unit (15) and a scheduler (38).

### Claim 12 (depends on 1)

Use of the process according to claim 1 in an ATSU calculator.

### Claim 13 (depends on 10)

Use of the process according to claim 10 in an ATSU calculator.
