Method and apparatus for inserting a tubing hanger into a live well
OwnerL. Murray Dallasinventor
Life of this patent
Estimating the term…
Abstract
Apparatus for inserting a tubing hanger into a tubing head spool on a live well includes a landing spool and a landing joint that reciprocates through a top end of the landing spool. The landing joint is connected to the tubing hanger. The landing spool is connected to a top flange of a blowout preventer on the live well. The blowout preventer is then opened and the tubing hanger is injected into the tubing head spool. A lifting spool is also provided to permit the tubing hanger to be injected without the use of a service rig. Safety is improved, costs reduced and production is facilitated because the well does not have to be killed.
Claims36
Apparatus for setting a tubing hanger in a tubing head spool on a live well, comprising:
- a) a landing spool for sealing attachment to a blowout preventer (BOP) mounted above the tubing head spool;
- and
- b) a landing joint reciprocally movable through a high-pressure fluid seal provided at a top end of the landing spool, the landing joint including a top end adapted for connection to a lift mechanism and a bottom end adapted for connection to the tubing hanger.
Apparatus as claimed in 6 further comprising a safety nut that is secured to a spiral thread on an outer surface of the top end of the landing spool, the safety nut having a top flange that extends over the gland nut to ensure that the gland nut is not ejected by elevated fluid pressures acting on the high-pressure packing.
Apparatus for setting a tubing hanger in a tubing head spool on a live well, comprising:
- a) a lifting spool adapted to be mounted to a blowout preventer (BOP) mounted above the tubing head spool, and further adapted to provide a high-pressure fluid seal when mounted to the BOP, the lifting spool including at least two attachment points for the connection of a lift mechanism used to raise and lower the tubing string;
- b) a landing spool adapted to be mounted to the lifting spool, and to provide a high-pressure fluid seal with the lifting spool;
- and
- c) a landing joint reciprocally movable through a high-pressure fluid seal provided at a top end of the landing spool, the landing joint including a top end adapted for connection to the lift mechanism and a bottom end adapted for connection to the tubing hanger.
A method of setting a tubing hanger in a tubing head spool of a live well, comprising steps of:
- a) supporting a plugged tubing string, run into the well through a blowout preventer (BOP), using slips to inhibit the tubing string from falling into the well, so that a tubing hanger connected to a top end of the tubing string is supported above the BOP;
- b) hoisting a landing spool with a landing joint into vertical alignment with the tubing hanger and connecting the landing joint to the tubing hanger;
- c) lifting the landing joint and the tubing string to free the slips;
- d) removing the slips and lowering the landing spool, and the landing joint if required, until the landing spool can be sealingly connected to a top flange of the BOP;
- e) equalizing pressure between the subterranean well and the landing spool;
- f) opening the BOP and running the tubing hanger into the tubing head spool;
- g) securing the tubing hanger in the tubing head spool;
- h) disconnecting the landing joint from the tubing hanger, and withdrawing the landing joint from the BOP;
- and
- i) closing the BOP, bleeding off pressure from the landing spool and removing the landing spool from the BOP.
A method of setting a tubing hanger in tubing head spool of a live well, comprising steps of:
- a) mounting a lifting spool to a top of a blowout preventer (BOP) mounted above a tubing head spool of the well;
- b) running a plugged tubing string into the well through the lifting spool and the BOP;
- c) supporting the plugged tubing string with slips at a top flange of the lifting spool to inhibit the tubing string from falling into the well, so that a tubing hanger connected to a top end of the tubing string is supported above the lifting spool;
- d) hoisting a landing spool with a landing joint and lift mechanisms adapted for connection to the lifting spool into vertical alignment with the tubing hanger;
- e) connecting the landing joint to the tubing hanger, and connecting the lift mechanisms to attachment points on the lifting spool;
- f) operating the lift mechanisms to lift the landing joint with the tubing string to free the slips;
- g) removing the slips and lowering the landing spool, and the landing joint if required, until the landing spool can be sealingly connected to a top flange of the lifting spool;
- j) equalizing pressure between the subterranean well and the landing spool;
- k) opening the BOP and running the tubing hanger into the tubing head spool;
- l) securing the tubing hanger in the tubing head spool;
- m) disconnecting the landing joint from the tubing hanger, and withdrawing the landing joint from the BOP;
- n) closing the BOP, bleeding off pressure from the landing spool and removing the landing spool from the lifting spool;
- and
- o) removing the lifting spool from the BOP.
Dependencies are inferred from the claim text.