# US 2002/0082814 A1 · A Yard Performance Model Based on Task Flow Modeling

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2002/0082814 A1
- Document ID: US20020082814A1
- Status: Published application
- Kind: A1
- Application number: 09/751,362
- Filed: 2000-12-28
- Published: 2002-06-27
- Earliest claimed: 2000-12-28
- Assignees: GE Harris Railway Electronics, LLC
- Inventors: John R Doner
- Web page: https://patentgrep.com/patent/US20020082814A1

## CPC

- B61L 27/60: Testing or simulation
- B61L 17/00: Switching systems for classification yards
- B61L 27/12: Preparing schedules
- G06Q 10/06: Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q 10/06311: {Scheduling, planning or task assignment for a person or group}
- B61L: GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC (brakes or auxiliary equipment B61H, B61K; point or crossing construction E01B)
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR

## Abstract

Abstract of Disclosure A method for managing railcar movement in a railyard based on the flow of railyard tasks, using a system that includes a computer including a processor, a memory device, and a database. The railyard includes six subyards including a surge yard, a receiving yard, a receiving inspected (RI) yard, a classification yard, a departure yard and a departure inspected (DI) yard. The method uses initial parameters, input to the computer, to simulate railyard task flow utilizing a yard performance model. Based on the simulation, the method determines if a train schedule can be met.

## Claims

### Claim at position 1

A method for managing railcar movement in a railyard based on the flow of railyard tasks, using a system including a computer that includes a processor, a memory device, and a database, the railyard including six subyards, said method comprising the steps of:
inputting initial parameters to the computer;
simulating railyard task flow utilizing a yard performance model and the initial parameters; and
determining if a train schedule can be met based on the simulated yard task flow.

### Claim at position 2 (depends on 1)

A method in accordance with Claim 1 wherein the six subyards include a surge yard, a receiving yard, a receiving inspected (RI) yard, a classification yard, a departure yard and a departure inspected (DI) yard, said step of inputting initial parameters to the computer comprises the steps of:
inputting a simulation ending time (Tf);
inputting at least one train schedule parameter;
inputting a time dependent modulation (TDM) parameter;
inputting at least one initial task backlog parameter;
inputting at least one yard topology parameter; and
inputting at least one initial labor assignment parameter.

### Claim at position 3 (depends on 2)

A method in accordance with Claim 2 wherein the railyard tasks include at least one of surge-to-receive railcar movement, receive yard inspection, receive-to-classification railcar movement, classification-to-departure railcar movement, and departure yard inspection, said step of simulating railyard task flow utilizing a yard performance model includes the step of executing a railyard performance algorithm.

### Claim at position 4 (depends on 3)

A method in accordance with Claim 3 wherein said step of executing a railyard performance algorithm comprises the steps of:
initializing a time (T) equal to the clock time at the railyard in which the simulation is to begin;
updating task backlogs based on the initial parameters;
computing task flow rates based on the updated task backlogs; and
determining whether time (T) equals simulation ending time (Tf).

### Claim at position 5 (depends on 4)

A method in accordance with Claim 4 wherein said step of determining if a train schedule can be met comprises the steps of:
verifying that time (T) does equal simulation ending time (Tf); and
calculating a train schedule based on the computed task flow rates.

### Claim at position 6 (depends on 4)

A method in accordance with Claim 4 wherein said step of simulating railyard task flow further comprises the steps of:
verifying that time (T) does not equal simulation ending time (Tf); and
executing a railyard performance algorithm subroutine.

### Claim at position 7 (depends on 6)

A method in accordance with Claim 6 wherein said step of executing a subroutine further comprises the steps of:
re-updating task backlogs;
re-computing task flow rates based on the re-updated task backlogs; and
determining whether time (T) equals simulation ending time (Tf).

### Claim at position 8 (depends on 7)

A method in accordance with Claim 7 wherein said step of re-updating task backlogs comprises the steps of:
determining whether time (T) equals a full hour;
determining whether time dependent modulation has been selected;
determining whether any of the subyards are congested; and
incrementing time (T) by 15 minutes.

### Claim at position 9 (depends on 8)

A method in accordance with Claim 8 wherein said step of determining whether time (T) equals a full hour comprises the steps of:
determining a new labor mix;
incrementing time (T) by fifteen minutes; and
activating the new labor mix.

### Claim at position 10 (depends on 8)

A method in accordance with Claim 8 wherein said step of determining whether time dependent modulation (TDM) has been selected comprises the step of modifying all task rates.

### Claim at position 11 (depends on 8)

A method in accordance with Claim 8 wherein said step of determining whether any of the subyards are congested comprises the step of modifying task rates of tasks performed by an engine crew.

### Claim at position 12 (depends on 7)

A method in accordance with Claim 7 wherein said step of determining whether time (T) equals simulation ending time (Tf) comprises the steps of:
verifying that time (T) does not equal simulation ending time (Tf); and
repeating execution of the subroutine.

### Claim at position 13 (depends on 7)

A method in accordance with Claim 7 wherein said step of determining whether time (T) equals simulation ending time (Tf) comprises the steps of:
verifying that time (T) does equal simulation ending time (Tf);
discontinuing execution of the subroutine; and
calculating a train schedule based on the re-computed task flow rates.

### Claim at position 14

A system for managing railcar movement in a railyard based on the flow of railyard tasks, said system comprising a computer comprising a processor, a memory device, and a database, the railyard including at least one of a surge yard, a receiving yard, a receiving inspected (RI) yard, a classification yard, a departure yard and a departure inspected (DI) yard, said system configured to:
input initial parameters to said computer,
simulate railyard task flow utilizing a yard performance model and the initial parameters; and
determine if a train schedule can be met based on the simulated yard task flow.

### Claim at position 15 (depends on 14)

A system in accordance with Claim 14 wherein to input the initial parameters to said computer, said system further configured to:
input a simulation ending time (Tf);
input at least one train schedule parameter;
input a time dependent modulation (TDM) parameter;
input at least one initial task backlog parameter;
input at least one yard topology parameter; and
input at least one initial labor assignment parameter.

### Claim at position 16 (depends on 15)

A system in accordance with Claim 15 wherein to simulate railyard task flow utilizing the yard performance model, said system further configured to execute a railyard performance algorithm.

### Claim at position 17 (depends on 16)

A system in accordance with Claim 16 wherein to execute said railyard performance algorithm, said system further configured to:
initialize a time (T) equal to the clock time at the railyard in which the simulation is to begin;
update task backlogs based on the initial parameters;
compute task flow rates based on the updated task backlogs; and
determine whether the time (T) equals the simulation ending time (Tf).

### Claim at position 18 (depends on 17)

A system in accordance with Claim 17 wherein to determine if a train schedule can be met, said system further configured to:
verify that the time (T) equals the simulation ending time (Tf); and
calculate a train schedule based on the computed task flow rates.

### Claim at position 19 (depends on 17)

A system in accordance with Claim 17 wherein to simulate railyard task flow, said system further configured to:
verify that the time (T) does not equal the simulation ending time (Tf); and
execute a railyard performance algorithm subroutine.

### Claim at position 20 (depends on 19)

A system in accordance with Claim 19 wherein to execute said subroutine, said system further configured to:
re-update the task backlogs;
re-compute the task flow rates based on the re-updated task backlogs; and
determine whether the time (T) equals the simulation ending time (Tf).

### Claim at position 21 (depends on 20)

A system in accordance with Claim 20 wherein to re-update task backlogs, said system further configured to:
determine whether the time (T) equals a selected length of time;
determine whether time dependent modulation has been selected;
determine whether any of the subyards are congested; and
increment the time (T) by a fraction of the selected length of time.

### Claim at position 22 (depends on 21)

A system in accordance with Claim 21 wherein to determine whether said time (T) equals the selected length of time, said system further configured to:
determine a new labor mix;
increment the time (T) by the fraction of the selected length of time; and
activate said new labor mix.

### Claim at position 23 (depends on 21)

A system in accordance with Claim 21 wherein to determine whether time dependent modulation (TDM) has been selected, said system further configured to modify all task rates.

### Claim at position 24 (depends on 21)

A system in accordance with Claim 21 wherein to determine whether any of the subyards are congested, said system further configured to modify task rates of tasks performed by an engine crew.

### Claim at position 25 (depends on 20)

A system in accordance with Claim 20 wherein to determine whether the time (T) equals the simulation ending time (Tf), said system further configured to:
verify that the time (T) does not equal the simulation ending time (Tf); and
repeat execution of said subroutine.

### Claim at position 26 (depends on 20)

A system in accordance with Claim 20 wherein to determine whether the time (T) equals the simulation ending time (Tf), said system further configured to:
verify that the time (T) equals the simulation ending time (Tf);
discontinue execution of said subroutine; and
calculate a train schedule based on the re-computed task flow rates.

### Claim at position 27

A railyard performance model for use in management of a railyard, the railyard including six subyards including a surge yard, a receiving yard, a receiving inspected (RI) yard, a classification yard, a departure yard and a departure inspected (DI) yard, said model configured to:
simulate railcar movement in a railyard based on the flow of railyard tasks; and
determine if a train schedule can be met based on the simulation.

### Claim at position 28 (depends on 27)

A model in accordance with Claim 27, wherein to simulate railcar movement, said model further configured to:
initialize a time (T) equal to the clock time at the railyard in which the simulation is to begin;
update task backlogs based on a set of initial parameters;
compute task flow rates based on the updated task backlogs; and
determine whether the time (T) equals a simulation ending time (Tf).

### Claim at position 29 (depends on 28)

A model in accordance with Claim 28 wherein to determine if a train schedule can be met, said model further configured to:
verify that the time (T) equals the simulation ending time (Tf); and
calculate a train schedule based on the computed task flow rates.

### Claim at position 30 (depends on 28)

A model in accordance with Claim 28 wherein to simulate railyard task flow, said model further configured to:
verify that the time (T) does not equal the simulation ending time (Tf); and
execute a railyard performance algorithm subroutine.

### Claim at position 31 (depends on 30)

A model in accordance with Claim 30 wherein to execute said subroutine, said model further configured to:
re-update the task backlogs;
re-compute the task flow rates based on the re-updated task backlogs; and
determine whether the time (T) equals the simulation ending time (Tf).

### Claim at position 32 (depends on 31)

A model in accordance with Claim 31 wherein to re-update task backlogs, said model further configured to:
determine whether the time (T) equals a selected length of time;
determine whether time dependent modulation has been selected;
determine whether any of the subyards are congested; and
increment the time (T) by a fraction of the selected length of time.

### Claim at position 33 (depends on 32)

A model in accordance with Claim 32 wherein to determine whether the time (T) equals the selected length of time, said model further configured to:
determine a new labor mix;
increment the time (T) by the fraction of the selected length of time; and
activate the new labor mix.

### Claim at position 34 (depends on 32)

A model in accordance with Claim 32 wherein to determine whether time dependent modulation (TDM) has been selected, said model further configured to modify all task rates.

### Claim at position 35 (depends on 32)

A model in accordance with Claim 32 wherein to determine whether any of the subyards are congested, said model further configured to modify task rates of tasks performed by an engine crew.

### Claim at position 36 (depends on 31)

A model in accordance with Claim 31 wherein to determine whether the time (T) equals the simulation ending time (Tf), said model further configured to:
verify that the time (T) does not equal the simulation ending time (Tf); and
repeat execution of the subroutine.

### Claim at position 37 (depends on 31)

A model in accordance with Claim 31 wherein to determine whether the time (T) equals the simulation ending time (Tf), said model further configured to:
verify that the time (T) equals the simulation ending time (Tf);
discontinue execution of the subroutine; and
calculate a train schedule based on the re-computed task flow rates.