# US 2002/0057948 A1 · Multi grouting system

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2002/0057948 A1
- Document ID: US20020057948A1
- Status: Published application
- Kind: A1
- Application number: 09/920,321
- Filed: 2001-08-02
- Published: 2002-05-16
- Earliest claimed: 2000-08-10
- Inventors: Steinar Roald; Tarald Nomeland; Zenon Kotelko
- Web page: https://patentgrep.com/patent/US20020057948A1

## CPC

- E21D 11/00: Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling (E21D15/00 - E21D23/00 take precedence; specially for shafts E21D5/00; {driving shields in combination with means for lining the tunnel E21D9/06}; lining pressure water galleries, linings therefor E02B9/06)
- C04B 28/32: Magnesium oxychloride cements, e.g. Sorel cement
- C09K 8/5045: {containing inorganic compounds}
- E02D 3/12: Consolidating by placing solidifying or pore-filling substances in the soil (making piles E02D5/46; soil-conditioning or soil-stabilising materials C09K17/00; consolidation of ground around boreholes or wells E21B43/025)
- E21D 9/002: {Injection methods characterised by the chemical composition used}
- E21D 9/1053: {for making a slit along the perimeter of the tunnel profile, the remaining core being removed subsequently, e.g. by blasting}
- C04B 2111/00724: {in mining operations, e.g. for backfilling; in making tunnels or galleries}
- C04B 2111/00732: {for soil stabilisation}
- Y02W 30/91: Use of waste materials as fillers for mortars or concrete
- E21D: SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS (soil-conditioning or soil-stabilising materials C09K17/00; drilling or cutting machines for mining or quarrying E21C; safety devices, transport, rescue, ventilation or drainage E21F)
- C04B: LIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE {(roofing granules E04D7/005)}; CERAMICS (devitrified glass-ceramics C03C10/00); REFRACTORIES; TREATMENT OF NATURAL STONE
- C09K: MATERIALS FOR MISCELLANEOUS APPLICATIONS, NOT PROVIDED FOR ELSEWHERE
- E02D: FOUNDATIONS; EXCAVATIONS; EMBANKMENTS (specially adapted for hydraulic engineering E02B); UNDERGROUND OR UNDERWATER STRUCTURES {(tunnels, tunnelling, mining E21)}
- Y02W: CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT

## Abstract

Discloses cementitious materials for treatment of underground or subterranean formations to reduce formation porosity for the control and of subterranean fluid flow as well as methods of applying the cementitous materials to the underground formations. The cementitious materials include both ordinary Portland cement and magnesium oxychloride cement which act co-operatively to produce a low permeability zone in the underground formation. Application methods describing injection of the cementitous materials into the underground formation to be treated are disclosed for treatment of pre-excavation formations and post excavation formations. Describes use of the cementitious materials and methods of application in relation to underground tunnel and roadway construction as well as foundation treatment of dam structures for water reservoirs.

## Claims

### Claim 1

A method of treating a subterranean formation comprising:
(a) forming at least one bore extending into a subterranean formation;
(b) supplying under pressure a magnesium oxychloride cementitious grout slurry to each said bore;
(c) forming a correspondingly disposed bore for each said bore of step (a) extending into said subterranean formation; and
(d) supplying under pressure an ordinary Porland cementitious grout slurry to each said correspondingly disposed bore.

### Claim 2 (depends on 1)

The method of claim 1 further including the step of supplying under pressure a magnesium oxychloride cementitious grout slurry to each said correspondingly disposed bore.

### Claim 3 (depends on 1)

The method of claim 1 wherein said magnesium oxychloride cementitious grout slurry is a mixture of water and magnesium oxychloride cement mixed in a ratio of 1:4 to 6:1 by volume.

### Claim 4 (depends on 1)

The method of claim 1 wherein said ordinary Portland cementitious grout slurry is a mixture of water and ordinary Portland cement mixed in a ratio of 1:4 to 6:1 by volume.

### Claim 5 (depends on 3)

The method of claim 3 wherein said magnesium oxychloride cemetitious grout slurry includes silica fume in quantities of up to 80% by weight of the magnesium oxychloride cement and water constituents of the slurry mixture.

### Claim 6 (depends on 4)

The method of claim 4 wherein said ordinary Portland cemenitious grout slurry includes silica fume in quantities of up to 80% by weight of the ordinary Portland cement and water constituents of the slurry mixture.

### Claim 7

A method of producing a low permeability zone in a subterranean formation surrounding a volume for excavation comprising:
(a) forming a plurality of bores extending into a subterranean formation, surrounding and extending outwardly a first selected distance from a predefined volume;
(b) supplying under pressure a magnesium oxychloride cementitious grout slurry to each said bore;
(c) excavating a selected distance into the portion of said subterranean formation surrounded by the bores formed in step (a) which is not more than one half of the depth of said bores to form an excavated front;
(d) at the location of said excavated front, forming a correspondingly disposed bore for each said bore of step (a) extending into said subterranean formation surrounding and extending outwardly a second selected distance from said predefined volume, which second selected distance is less than said first selected distance; and
(e) supplying under pressure an ordinary Portland cementitious grout slurry to each said correspondingly disposed bore.

### Claim 8 (depends on 7)

The method of claim 7 wherein said correspondingly disposed bore is offset from each said bore of step (a) of claim 7 to produce an off-set pattern therebetween.

### Claim 9 (depends on 7)

The method of claim 7 further including the step of supplying under pressure a magnesium oxychloride cementitious grout slurry to each said correspondingly disposed bore.

### Claim 10 (depends on 7)

The method of claim 7 wherein said magnesium oxychloride cementitious grout slurry is a mixture of water and magnesium oxychloride cement mixed in a ratio of 1:4 to 6:1 by volume.

### Claim 11 (depends on 7)

The method of claim 7 wherein said ordinary Portland cementitious grout slurry is a mixture of water and ordinary Portland cement mixed in a ratio of 1:4 to 6:1 by volume.

### Claim 12 (depends on 10)

The method of claim 10 wherein said magnesium oxychloride cementitious grout slurry includes silica fume in quantities of up to 80% by weight of the magnesium oxychloride cement and water constituents of the slurry mixture.

### Claim 13 (depends on 11)

The method of claim 11 wherein said ordinary Portland cementitious grout slurry includes silica fume in quantities of up to 80% by weight of the ordinary Portland cement and water constituents of the slurry mixture.

### Claim 14

A method of producing a low permeability zone in a subterranean formation surrounding an excavated volume comprising:
(a) forming a plurality of bores extending into a subterranean formation, surrounding and extending outwardly a first selected distance from an excavated volume;
(b) supplying under pressure a magnesium oxychloride cementitious grout slurry to each said bore;
(c) longitudinally displaced a selected distance along said excavation from the bores formed in step (a) which is not more than one half of the depth of said bores, forming a correspondingly disposed bore for each said bore of step (a), the correspondingly disposed bore extending into said subterranean formation surrounding and extending outwardly a second selected distance from said excavated volume, which second selected distance is greater than said first selected distance; and
(d) supplying under pressure an ordinary Portland cementitious grout slurry to each said correspondingly disposed bore.

### Claim 15 (depends on 14)

The method of claim 14 wherein said correspondingly disposed bore is offset from each said bore of step (a) of claim 14 to produce an off-set pattern therebetween.

### Claim 16 (depends on 14)

The method of claim 14 further including the step of supplying under pressure a magnesium oxychloride cementitious grout slurry to each said correspondingly disposed bore following the step of supplying under pressure an ordinary Portland cementitious slurry.

### Claim 17 (depends on 14)

The method of claim 14 wherein said magnesium oxychloride cementitious grout slurry is a mixture of water and magnesium oxychloride cement mixed in a ratio of 1:4 to 6:1 by volume.

### Claim 18 (depends on 14)

The method of claim 14 wherein said ordinary Portland cementitious grout slurry is a mixture of water and ordinary Portland cement mixed in a ratio of 1:4 to 6:1 by volume.

### Claim 19 (depends on 17)

The method of claim 17 wherein said magnesium oxychloride cementitious grout slurry includes silica fume in quantities of up to 80% by weight of the magnesium oxychloride cement and water constituents of the slurry mixture.

### Claim 20 (depends on 18)

The method of claim 18 wherein said ordinary Portland cementitious grout slurry includes silica fume in quantities of up to 80% by weight of the ordinary Portland cement and water constituents of the slurry mixture.

### Claim 21

A mixture for treatment of a subterranean formation comprising:
(a) a first slurry of ordinary Portland grout produced from mixing water and ordinary Portland cement mixed in a ratio of 1:4 to 6:1 by volume; mixed with
(b) a second slurry of magnesium oxychloride grout produced from mixing water and magnesium oxychloride cement mixed in a ratio of 1:4 to 6:1 by volume.

### Claim 22 (depends on 21)

The mixture of claim 21 further including:
(a) silica fume in quantities of up to 80% by weight of the mixture constituents of ordinary Portland cement, magnesium oxychloride cement and water of each respective slurry.

### Claim 23

A method of creating a low permeability zone in a subterranean formation containing water under pressure comprising:
(a) forming a bore into the formation;
(b) supplying under pressure a volume of an ordinary Portland cementitious grout slurry to the bore; and
(c) supplying under pressure a substantially similar volume of a magnesium oxychloride cementitious grout slurry to the bore.