Method and apparatus for increasing fluid recovery from a subterranean formation
AssigneesKelley & Sons Group International, Inc., Robert E. Snyder
InventorsTerry E. Kelley, Robert E. Snyder
Life of this patent
Estimating the term…
Loading patent…
AssigneesKelley & Sons Group International, Inc., Robert E. Snyder
InventorsTerry E. Kelley, Robert E. Snyder
Estimating the term…
A downhole injector 10, 26, 38 and 54 is provided at the lower end of the production tubing string TS for passing liquids from a downhole formation into the tubing string while preventing gases from passing through the injector. The injector may include an improved screen 36 for preventing formation sand from entering the injector. The system may include a packer 44 in the annulus A above the injector. In one application, a vent tube 46 extends upward from the packer into the annulus for maintaining a desired liquid level in the annulus above the packer. A plurality of through ports 40 establish fluid communication in the annulus above the packer and the production tubing string so that a downhole pump P may efficiently pump downhole fluids to the surface. The injector of the present invention may be used with one or more lift valves LV for raising slugs of liquid upward to the surface through the production tubing string. The present invention may also be used with horizontal bore hole technology for increased hydrocarbon recovery by retaining the gases downhole to act upon liquid hydrocarbons and maintaining a driving force for pushing the liquids toward the injector for recovery.
A system for recovering liquids from a downhole formation and through a production tubing string, comprising:
A method of recovering liquids from a downhole formation and through a production tubing string, comprising:
A system for recovering liquids from a downhole formation and through a production tubing string, comprising:
A method of recovering liquids from a downhole formation and through a production tubing string, comprising:
An injector for positioning downhole within the hydrocarbon recovery well to permit liquids to pass from a downhole formation through the injector, through a check valve for preventing fluids which pass by the check valve from returning to the shutoff valve, and into a production tubing string, while preventing gases from passing through the injector, the injector comprising:
A method of recovering liquids from a downhole formation and through a production tubing string, comprising:
A system for recovering liquids from a downhole formation and through a production tubing string, comprising:
A method of recovering liquids from a downhole formation and through a production tubing string, comprising:
Dependencies are inferred from the claim text.