# US 2001/0027407 A1 · Control and inquiry system for construction work

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2001/0027407 A1
- Document ID: US20010027407A1
- Status: Published application
- Kind: A1
- Application number: 09/765,221
- Filed: 2001-01-18
- Published: 2001-10-04
- Earliest claimed: 2000-04-04
- Inventors: Kazuhiko Mori
- Web page: https://patentgrep.com/patent/US20010027407A1

## CPC

- G06Q 10/06: Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q 10/0631: Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q 50/165: {Land development}
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR

## Abstract

A control and inquiry system handles construction project information that is related to the construction of a building. The construction project information includes content information, work schedule information, work progress information and change order information and is maintained on a control and inquiry computer system that is coupled to a computer network. Construction project information may be accessed by a home builder computer system and a client computer system that are also coupled to the computer network.

## Claims

### Claim 1

A method for handling construction project information related to the construction of a building, the construction project information including content information, work schedule information, work progress information and change order information, the method comprising the steps of:
receiving content information related to the design of a building;
receiving work schedule information that indicates a projected schedule as to when various construction stages of the building are to be completed;
receiving work progress information that indicates the actual progress of the building;
receiving change order information directed to changes in the design of the building; and
providing the construction project information to an authorized party, when requested.

### Claim 2 (depends on 1)

The method of claim 1, wherein the construction project information is only available to a requesting party that furnishes an appropriate one of an identification (ID) number, a password, a voiceprint and a cryptogram.

### Claim 3 (depends on 1)

The method of claim 1, further including the step of:
revising the work schedule information when the change order information impacts the projected schedule.

### Claim 4 (depends on 1)

The method of claim 1, wherein the construction project information further includes profiles of a general contractor, a site superintendent and all subcontractors furnishing at least one of labor and material.

### Claim 5 (depends on 4)

The method of claim 4, further including the step of:
notifying at least one of the general contractor and the site superintendent when work progress information is not received for a predetermined time.

### Claim 6 (depends on 1)

The method of claim 1, wherein the work progress information includes at least one current image of the construction site and the building which details changes in at least one of the building and construction site that have occurred from at least one previous image.

### Claim 7 (depends on 6)

The method of claim 6, further including the step of:
authorizing payment to the subcontractor that has fulfilled its obligation when the at least one current image validates that the subcontractor has furnished at least one of the contracted labor and contracted material.

### Claim 8 (depends on 1)

The method of claim 1, further including the step of:
verifying the authorized party received the requested construction project information.

### Claim 9 (depends on 1)

The method of claim 1, further including the step of:
requesting updated construction project information from at least one of the general contractor and the site superintendent when required construction project information has not been received within a predetermined time period.

### Claim 10 (depends on 1)

The method of claim 1, further including the steps of:
receiving a building site inspection request from a building purchaser;
providing the building site inspection request to at least one of the general contractor and the site superintendent; and
coordinating a mutually acceptable time and date between the building purchaser and at least one of the general contractor and the site superintendent.

### Claim 11 (depends on 1)

The method of claim 1, further including the step of:
providing a warning to at least one of the general contractor and the site superintendent when a building purchaser reports a building associated problem.

### Claim 12 (depends on 11)

The method of claim 11, further including the step of:
scheduling correction of the reported building associated problem with an appropriate subcontractor.

### Claim 13 (depends on 1)

The method of claim 1, wherein the construction project information further includes location information for determining the location of at least one of the general contractor, the site superintendent and the subcontractors furnishing at least one of labor and material.

### Claim 14 (depends on 13)

The method of claim 13, wherein the location information is provided by a portable telephone in the possession of at least one of the general contractor, the site superintendent and the subcontractors.

### Claim 15

A control and inquiry system for handling construction project information related to the construction of a building, the construction project information including content information, work schedule information, work progress information and change order information, the system comprising:
a control and inquiry computer system coupled to a computer network and storing construction project information;
a home builder computer system coupled to the computer network;
a client computer system coupled to the computer network; and
control and inquiry code executing on the control and inquiry computer system and causing the control and inquiry computer system to perform the steps of:
receiving content information related to the design of a building from the home builder computer system;
receiving work schedule information that indicates a projected schedule as to when various construction stages of the building are to be completed from the home builder computer system;
receiving work progress information that indicates the actual progress of the building;
receiving change order information directed to changes in the design of the building; and
providing the construction project information to an authorized party, when requested.

### Claim 16 (depends on 15)

The system of claim 15, wherein the construction project information is only available to a requesting party that furnishes an appropriate one of an identification (ID) number, a password, a voiceprint and a cryptogram.

### Claim 17 (depends on 15)

The system of claim 15, wherein the control and inquiry code causes the control and inquiry computer system to perform the additional step of:
revising the work schedule information when the change order information impacts the projected schedule.

### Claim 18 (depends on 15)

The system of claim 15, wherein the construction project information further includes profiles of a general contractor, a site superintendent and all subcontractors furnishing at least one of labor and material.

### Claim 19 (depends on 18)

The system of claim 18, wherein the control and inquiry code causes the control and inquiry computer system to perform the additional step of:
notifying at least one of the general contractor and the site superintendent when work progress information is not received for a predetermined time.

### Claim 20 (depends on 15)

The system of claim 15, wherein the work progress information includes at least one current image of the construction site and the building which details changes in at least one of the building and construction site that have occurred from at least one previous image.

### Claim 21 (depends on 20)

The system of claim 20, wherein the control and inquiry code causes the control and inquiry computer system to perform the additional step of:
authorizing payment to the subcontractor that has fulfilled its obligation when the at least one current image validates that the subcontractor has furnished at least one of the contracted labor and contracted material.

### Claim 22 (depends on 15)

The system of claim 15, wherein the control and inquiry code causes the control and inquiry computer system to perform the additional step of:
verifying the authorized party received the requested construction project information.

### Claim 23 (depends on 15)

The system of claim 15, wherein the control and inquiry code causes the control and inquiry computer system to perform the additional step of:
requesting updated construction project information from at least one of the general contractor and the site superintendent when required construction project information has not been received within a predetermined time period.

### Claim 24 (depends on 15)

The system of claim 15, wherein the control and inquiry code causes the control and inquiry computer system to perform the additional steps of:
receiving a building site inspection request from a building purchaser;
providing the building site inspection request to at least one of the general contractor and the site superintendent; and
coordinating a mutually acceptable time and date between the building purchaser and at least one of the general contractor and the site superintendent.

### Claim 25 (depends on 15)

The system of claim 15, wherein the control and inquiry code causes the control and inquiry computer system to perform the additional step of:
providing a warning to at least one of the general contractor and the site superintendent when a building purchaser reports a building associated problem.

### Claim 26 (depends on 25)

The system of claim 25, wherein the control and inquiry code causes the control and inquiry computer system to perform the additional step of:
scheduling correction of the reported building associated problem with an appropriate subcontractor.

### Claim 27 (depends on 15)

The system of claim 15, wherein the construction project information further includes location information for determining the location of at least one of the general contractor, the site superintendent and the subcontractors furnishing at least one of labor and material.

### Claim 28 (depends on 27)

The system of claim 27, wherein the location information is provided by a portable telephone in the possession of at least one of the general contractor, the site superintendent and the subcontractors.

### Claim 29

A control and inquiry system for handling construction project information related to the construction of a building, the construction project information including content information, work schedule information, work progress information and change order information, the system comprising:
a control and inquiry computer system coupled to a computer network and storing construction project information;
a home builder computer system coupled to the computer network;
a client computer system coupled to the computer network; and
control and inquiry code executing on the control and inquiry computer system and causing the computer system to perform the steps of:
receiving content information related to the design of a building from the home builder computer system;
receiving work schedule information that indicates a projected schedule as to when various construction stages of the building are to be completed from the home builder computer system;
receiving work progress information that indicates the actual progress of the building;
receiving change order information directed to changes in the design of the building; and
providing the construction project information to an authorized party, when requested, wherein the authorized party includes the home builder computer system and the client computer system.