# US 2001/0026731 A1 · Construction methods for preventing land erosion and improving streams, or for revetments, and construction methods for preventing mountain landslides

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2001/0026731 A1
- Document ID: US20010026731A1
- Status: Published application
- Kind: A1
- Application number: 09/780,278
- Filed: 2001-02-09
- Published: 2001-10-04
- Earliest claimed: 1996-10-18
- Inventors: Tomio Fukui
- Web page: https://patentgrep.com/patent/US20010026731A1

## CPC

- E02B 3/02: Stream regulation, e.g. breaking up subaqueous rock, cleaning the beds of waterways, directing the water flow ({harvesting water plants A01D44/00; underwater loosening of soil or rocks for foundation construction E02D17/16}; dredging or scraping devices E02F5/28)
- E02D 17/20: Securing of slopes or inclines {(by soil E02D3/12; protection against snowslides or avalanches E01F7/04, E01F15/00; securing banks or like surfaces facing on bodies of water E02B3/12)}
- Y02A 10/23: Dune restoration or creation; Cliff stabilisation
- Y02A 10/30: Flood prevention; Flood or storm water management, e.g. using flood barriers
- Y02A 50/00: in human health protection, e.g. against extreme weather
- E02B: HYDRAULIC ENGINEERING (ship-lifting E02C; dredging E02F)
- E02D: FOUNDATIONS; EXCAVATIONS; EMBANKMENTS (specially adapted for hydraulic engineering E02B); UNDERGROUND OR UNDERWATER STRUCTURES {(tunnels, tunnelling, mining E21)}
- Y02A: TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE

## Abstract

Erosion or collapse of a stream or a river is prevented by mooring timber, stones, or the like with a longitudinal cable (steel cable) (1). Barrier-like members (3) such as timber and stones moored by using the longitudinal cable (1) are arranged substantially stepwise or parallel to each other on the ground near the eroded or collapsed place to prevent mountain landslides.

## Claims

### Claim 1

A construction method for preventing land erosion and improving a stream, comprising:
(a) a step of directly or indirectly fixing at least one longitudinal cable (1) to a base point (2); and
(b) a step of mooring at least two barrier-like members (3) directly by using said longitudinal cable (1) or by using a mooring cable (4) connected to said longitudinal cable (1), so that the at least two barrier-like members (3) are provided in a stream or a river substantially perpendicular to the direction of the current of water at an appropriate interval in the direction from the upper end to the lower end of the stream or river.

### Claim 2 (depends on 1)

The construction method for preventing land erosion and improving a stream according to claim 1, wherein the base point (2) is provided on land along the stream or river.

### Claim 3 (depends on 1)

The construction method for preventing land-erosion and improving a stream according to claim 1, wherein the base point (2) is provided in the stream or river.

### Claim 4 (depends on 1)

The construction method for preventing land erosion and improving a stream according to claim 1, wherein the base point (2) is a tree, a rock, or an artificial structure.

### Claim 5 (depends on 1)

The construction method for preventing land erosion and improving a stream according to claim 1, wherein said longitudinal cable (1) is directly fixed to said base point (2).

### Claim 6 (depends on 1)

The construction method for preventing land erosion and improving a stream according to claim 1, wherein said longitudinal cable (1) is indirectly fixed to said base point (2) via an auxiliary cable (5).

### Claim 7 (depends on 1)

The construction method for preventing land erosion and improving a stream according to claim 1, wherein said barrier-like members (3) are selected from the group consisting of a single piece of timber, bound timber, timber connected in a venetian-blind shape, a concrete block, a wire cylinder filled with stones, and a sandbag.

### Claim 8 (depends on 1)

The construction method for preventing land erosion and improving a stream according to claim 1, wherein said barrier-like members (3) are directly moored by using said longitudinal cable (1).

### Claim 9 (depends on 1)

The construction method for preventing land erosion and improving a stream according to claim 1, wherein said barrier-like members (3) are moored by using said mooring cable (4).

### Claim 10 (depends on 1)

The construction method for preventing land erosion and improving a stream according to claim 1, wherein at least three barrier-like members (3) are provided, including at least two barrier-like members (3) that are placed side-by-side and which may be connected to each other with a connecting cable (6).

### Claim 11

A construction method for preventing land erosion and improving a stream, comprising:
(a) a step of directly or indirectly fixing at least two longitudinal cables (1) to a base point (2);
(b) a step of connecting said longitudinal cables (1) to each other by the use of at least one lateral cable (7); and
(c) a step of mooring at least two barrier-like members (3) directly by using said longitudinal cables (1) and/or said lateral cable (7) or by using a mooring cable (4) connected to each longitudinal cable (1) and/or said lateral cable (7), so that the at least two barrier-like members (3) are provided in a stream or a river substantially perpendicular to the direction of the current of water at an appropriate interval in the direction from the upper end to the lower end of the stream or river.

### Claim 12 (depends on 11)

The construction method for preventing land erosion and improving a stream according to claim 11, wherein said barrier-like members (3) are directly moored by using said longitudinal cables (1) and/or said lateral cable (7).

### Claim 13

A construction method for a revetment, comprising:
(a) a step of directly or indirectly fixing at least one longitudinal cable (1) to a base point (2); and
(b) a step of mooring at least one barrier-like member (3) directly by using said longitudinal cable (1) or by using a mooring cable (4) connected to said longitudinal cable (1), so that said barrier-like member (3) is provided in a stream or a river and along its bank.

### Claim 14 (depends on 13)

The construction method for a revetment according to claim 13, wherein the base point (2) is provided on land along the stream or river.

### Claim 15 (depends on 13)

The construction method for a revetment according to claim 13, wherein the base point (2) is provided in the stream or river.

### Claim 16 (depends on 13)

The construction method for a revetment according to claim 13, wherein the base point (2) is a tree, a rock, or an artificial structure.

### Claim 17 (depends on 13)

The construction method for a revetment according to claim 13, wherein said longitudinal cable (1) is directly fixed to said base point (2).

### Claim 18 (depends on 13)

The construction method for a revetment according to claim 13, wherein said longitudinal cable (1) is indirectly fixed to said base point (2) via an auxiliary cable (5).

### Claim 19 (depends on 13)

The construction method for a revetment according to claim 13, wherein said barrier-like member (3) is selected from the group consisting of a single piece of timber, bound timber, timber connected in a venetian-blind shape, a concrete block, a wire cylinder filled with stones, and a sandbag.

### Claim 20 (depends on 13)

The construction method for a revetment according to claim 13, wherein said barrier-like member (3) is directly moored by using said longitudinal cable (1).

### Claim 21 (depends on 13)

The construction method for a revetment according to claim 13, wherein said barrier-like member (3) is moored by using said mooring cable (4).

### Claim 22 (depends on 13)

The construction method for a revetment according to claim 13, wherein there are provided at least two barrier-like members (3) connected in series to each other with a connecting cable (6).

### Claim 23

A construction method for preventing mountain landslides, comprising:
(a) a step of directly or indirectly fixing at least one longitudinal cable (1) to a base point (2) so as to provide the longitudinal cable (1) on both sides of a mountain across a ridge of the mountain; and
(b) a step of mooring at least two barrier-like members (3) directly by using said longitudinal cable (1) or by using a mooring cable (4) connected to said longitudinal cable (1), 50 that the at least two barrier-like members (3) are provided on each side of the mountain at an appropriate interval in the direction of the height of a mountain with the longer dimension of each barrier-like member (3) extending substantially at right angles to the direction of the height of the mountain.

### Claim 24 (depends on 23)

The construction method for preventing mountain landslides according to claim 23, wherein said base point (2) is a tree, a rock, or an artificial structure.

### Claim 25 (depends on 23)

The construction method for preventing mountain landslides according to claim 23, wherein said longitudinal cable (1) is directly fixed to said base point (2).

### Claim 26 (depends on 23)

The construction method for preventing mountain landslides according to claim 23, wherein said longitudinal cable (1) is indirectly fixed to said base point (2) via an auxiliary cable (5).

### Claim 27 (depends on 23)

The construction method for preventing mountain landslides according to claim 23, wherein said barrier-like members (3) are selected from the group consisting of a single piece of timber, bound timber, timber connected in a venetian-blind shape, a concrete block, a wire-cylinder filled with stones, and a sandbag.

### Claim 28 (depends on 23)

The construction method for preventing mountain landslides according to claim 23, wherein said barrier-like members (3) are moored so that they are provided stepwise on a mountainside.

### Claim 29 (depends on 23)

The construction method for preventing mountain landslides according to claim 23, wherein said barrier-like members (3) are directly moored by using said longitudinal cable (1).

### Claim 30 (depends on 23)

The construction method for preventing mountain landslides according to claim 23, wherein said barrier-like members (3) are moored by using said mooring cable (4).

### Claim 31 (depends on 23)

The construction method for preventing mountain landslides according to claim 23, wherein on at least one side of the mountain, at least three barrier-like members (3) are provided, including at least two barrier-like members (3) which are placed side-by-side and which may be connected to each other with a connecting cable (6).

### Claim 32 (depends on 31)

The construction method for preventing mountain landslides according to claim 31, wherein at least one barrier-like member (3) is provided at each end of said longitudinal cable (1).

### Claim 33

A construction method for preventing mountain landslides, comprising:
(a) a step of directly or indirectly fixing at least two longitudinal cables (1) to a base point (2);
(b) a step of connecting said longitudinal cables (1) to each other with at least one lateral cable (7);
(c) a step of mooring at least two barrier-like members (3) directly by using said longitudinal cables (1) and/or said lateral cable (7) or by using a mooring cable (4) connected to each longitudinal cable (1) and/or said lateral cable (7), so that the at least two barrier-like members (3) are provided at an appropriate interval in the direction of the height of a mountain with the longer dimension of each barrier-like member (3) substantially at right angles to the direction of the height of the mountain; and
wherein said base point (2) is provided on a slope opposite the side of the mountain on which said barrier-like members (3) are provided, and said longitudinal cables (1) are fixed to said base point (2) across a ridge of the mountain.

### Claim 34

A construction method for preventing land erosion and improving a stream, comprising:
(a) a step of directly or indirectly fixing a lateral cable (7) to at least two base points (2); and
(b) a step of mooring directly by using said lateral cable (7) or by using a mooring cable (4) connected to said lateral cable (7) at least one barrier-like member (3) in a stream or a river so as to be provided substantially perpendicular to the direction of the current of water;
wherein at least two sets of structures, each comprising said lateral cable (7), the base points (2), and the barrier-like member (3) as essential components, are placed, so that said barrier-like members (3) are provided in the stream or river at an appropriate interval in the direction from the upper end to the lower end of the stream or river.

### Claim 35 (depends on 34)

The construction method for preventing land erosion and improving a stream according to claim 34, wherein said lateral cable (7) is directly fixed to said base points (2).

### Claim 36 (depends on 34)

The construction method for preventing land erosion and improving a stream according to claim 34, wherein said lateral cable (7) is indirectly fixed to said base points (2) via an auxiliary cable (5).

### Claim 37 (depends on 34)

The construction method for preventing land erosion and improving a stream according to claim 34, wherein said barrier-like member (3) is directly moored by using said lateral-cable (7).

### Claim 38 (depends on 34)

The construction method for preventing land erosion and improving a stream according to claim 34, wherein at least one set of said structures comprises at least two barrier-like members (3) which are placed side-by-side and which may be connected to each other with a connecting cable (6).

### Claim 39

A land-erosion-preventive or site am-imp roving structure comprising at least one longitudinal cable (1), a base point (2), and at least two barrier-like members (3), and further and optionally a mooring cable (4) and/or an auxiliary cable (5), wherein said longitudinal cable (1) is fixed to said base point (2) directly or indirectly via said auxiliary cable (5), and wherein said barrier-like members (3) are moored directly by using said longitudinal cable (1) or by using said mooring cable (4) connected to said longitudinal cable (1), so that the barrier-like members (3) are provided in a stream or a river substantially perpendicular to the direction of the current of water at an appropriate interval in the direction from the upper end to the lower end of the stream or river.

### Claim 40

A land-erosion-preventive or stream-imp roving structure comprising at least two longitudinal cables (1), a base point (2), at least one lateral cable (7), and at least two barrier-like members (3), and further and optionally a mooring cable (4) and/or an auxiliary cable (5), wherein said longitudinal cables (1) are fixed to said base point (2) directly or indirectly via said auxiliary cable (5), and are connected to each other with said lateral cable (7), and said barrier-like members (3) are moored directly by using said longitudinal cables (1) and/or said lateral cable (7), or by using said mooring cable (4) connected to each longitudinal cable (1) and/or said lateral cable (7), so that the barrier-like members (3) are provided in a stream or river substantially perpendicular to the direction of the current of water at an appropriate interval in the direction from the upper end to the lower end of the stream or river.

### Claim 41

A revetment structure comprising at least one longitudinal cable (1), a base point (2), and at least one barrier-like member (3), and further and optionally a mooring cable (4) and/or an auxiliary cable (5), wherein said longitudinal cable (1) is fixed to said base point (2) directly or indirectly via said auxiliary cable (5), and said barrier-like members (3) are moored directly by using said longitudinal cable (1) or by using said mooring cable (4) connected to said longitudinal cable (1), so that said barrier-like members (3) are placed in a stream or river and along its bank.

### Claim 42

A mountain-landslide-preventive structure comprising at least one longitudinal cable (1), a base point (2), and at least two barrier-like members (3), and further and optionally a mooring cable (4) and/or an auxiliary cable (5), wherein said longitudinal cable (1) is fixed to said base point (2) directly or indirectly via said auxiliary cable (5) so as to provide the longitudinal cable (1) on both sides of a mountain across a ridge of the mountain, and said barrier-like members (3) are moored directly by using said longitudinal cable (1) or by using said mooring cable (4) connected to said longitudinal cable (1), 50 that the barrier-like members (3) are provided at an appropriate interval in the direction of the height of a mountain with their longer dimensions substantially at right angles to the direction of the height of the mountain.

### Claim 43

A mountain-landslide-preventive structure comprising at least two longitudinal cables (1), a base point (2), at least one lateral cable (7), and at least two barrier-like members (3), and further and optionally a mooring cable (4) and/or an auxiliary cable (5), wherein said longitudinal cables (1) are fixed to said base point (2) directly or indirectly via said auxiliary cable (5) so as to provide the longitudinal cables (1) on both sides of a mountain across a ridge of the mountain, and are connected to each other with said lateral cable (7), and said barrier-like members (3) are moored directly by using said longitudinal cables (1) and/or said lateral cable (7) or by using said mooring cable (4) connected to each longitudinal cable (1) and/or said lateral cable (7), so that the barrier-like members (3) are provided at an appropriate interval in the direction of the height of a mountain with their longer dimensions substantially at right angles to the direction of the height of the mountain.

### Claim 44

A land-erosion-preventive or stream-improving structure comprising a lateral cable (7), at least two base points (2), and at least one barrier-like member (3), and further and optionally a mooring cable (4) and/or an auxiliary cable (5), wherein said lateral cable (7) is fixed to said base points (2) directly or indirectly via said auxiliary cable (5), and said barrier-like member (3) is moored directly by using said lateral cable (7) or by using said mooring cable (4) connected to said lateral cable (7), so as to be provided in a stream or a river substantially perpendicular to the direction of the current of water.

### Claim 45 (depends on 1)

The construction method for preventing land erosion and improving a stream according to claim 1, wherein the base point (2) is provided on any location chosen from a slope of a mountain on the side where the stream or river is located, a mountain ridge, and a slope of a mountain opposite the side where the stream or river is located.

### Claim 46 (depends on 13)

The construction method for preventing land erosion and improving a stream according to claim 13, wherein the base point (2) is provided on any location chosen from a slope of a mountain on the side where the stream or river is located, a mountain ridge, and a slope of a mountain opposite the side where the stream or river is located.

### Claim 47

A construction method for preventing mountain landslides, comprising:
(a) a step of directly or indirectly fixing at least one longitudinal cable (1) to a base point (2); and
(b) a step of mooring at least two barrier-like members (3) directly by using said longitudinal cable (1) or by using a mooring cable (4) connected to said longitudinal cable (1), so that the at least two barrier-like members (3) are provided at an appropriate interval in the direction of the height of a mountain with the longer dimension of each barrier-like member (3) extending substantially at right angles to the direction of the height of the mountain;
wherein said base point (2) is located on a slope of the mountain opposite the side of the mountain where said barrier-like members (3) are provided, and said longitudinal cable (1) is fixed to said base point (2) so that the cable (1) extends across a ridge of the mountain.

### Claim 48 (depends on 47)

The construction method for preventing mountain landslides according to claim 47, wherein a base point (2) is additionally provided on the ridge of the mountain.

### Claim 49

A construction method for preventing mountain landslides, comprising:
(a) a step of directly or indirectly fixing at least one longitudinal cable (1) to a base point (2) constituted by a cable that is wound around a mountain; and
(b) a step of mooring at least two barrier-like members (3) directly by using said longitudinal cable (1) or by using a mooring cable (4) connected to said longitudinal cable (1), so that the at least two barrier-like members (3) are provided at an appropriate interval in the direction of the height of the mountain with the longer dimension of each barrier-like member (3) extending substantially at right angles to the direction of the height of the mountain.

### Claim 50

A construction method for preventing mountain landslides, comprising:
(a) a step of directly or indirectly fixing at least two longitudinal cables (1) to a base point (2) so as to provide the longitudinal cables (1) on both sides of a mountain across a ridge of the mountain;
(b) a step of connecting said longitudinal cables (1) to each other with at least one lateral cable (7); and
(c) a step of mooring at least two barrier-like members (3) for each side of the mountain directly by using said longitudinal cables (1) and/or said lateral cable (7) or by using a mooring cable (4) connected to each longitudinal cable (1) and/or said lateral cable (7), so that the at least two barrier-like members (3) are provided on each side of the mountain at an appropriate interval in the direction of the height of the mountain with the longer dimension of each barrier-like member (3) substantially at right angles to the direction of the height of the mountain.

### Claim 51 (depends on 50)

The construction method for preventing mountain landslides according to claim 50, wherein said barrier-like members (3) are moored directly by using said longitudinal cables (1) and/or said lateral cable (7).

### Claim 52

A construction method for preventing mountain landslides, comprising:
(a) a step of directly or indirectly fixing at least two longitudinal cables (1) to a base point (2) constituted by a cable that is wound around a mountain;
(b) a step of connecting said longitudinal cables (1) to each other with at least one lateral cable (7); and
(c) a step of mooring at least two barrier-like members (3) directly by using said longitudinal cables (1) and/or said lateral cable (7) or by using a mooring cable (4) connected to each longitudinal cable (1) and/or said lateral cable (7), so that the at least two barrier-like members (3) are provided at an appropriate interval in the direction of the height of the mountain with the longer dimension of each barrier-like member (3) substantially at right angles to the direction of the height of the mountain.

### Claim 53

A mountain-landslide-preventive structure comprising at least one longitudinal cable (1), a base point (2), and at least two barrier-like members (3), and further and optionally a mooring cable (4) and/or an auxiliary cable (5), wherein said barrier-like members (3) are moored directly by using said longitudinal cable (1) or by using said mooring cable (4) connected to said longitudinal cable (1), so that the barrier-like members (3) are provided at an appropriate interval in the direction of the height of a mountain with their longer dimensions substantially at right angles to the direction of the height of the mountain, said base point (2) is provided on a slope of the mountain opposite the side of the mountain on which said barrier-like members (3) are provided, and said longitudinal cable (1) is fixed to said base point (2) directly or indirectly via said auxiliary cable (5) across a ridge of the mountain.

### Claim 54

A mountain-landslide-preventive structure comprising at least one longitudinal cable (1), a base point (2) constituted by a cable that is wound around a mountain, and at least two barrier-like members (3), and further and optionally a mooring cable (4), wherein said longitudinal cable (1) is fixed to said base point (2), and said barrier-like members (3) are moored directly by using said longitudinal cable (1) or by using said mooring cable (4) connected to said longitudinal cable (1), 50 that the barrier-like members (3) are provided at an appropriate interval in the direction of the height of the mountain with their longer dimensions substantially at right angles to the direction of the height of the mountain.

### Claim 55

A mountain-landslide-preventive structure comprising at least two longitudinal cables (1), a base point (2), at least one lateral cable (7), and at least two barrier-like members (3), and further and optionally a mooring cable (4) and/or an auxiliary cable (5), wherein said barrier-like members (3) are moored directly by using said longitudinal cables (1) and/or said lateral cable (7) or by using said mooring cable (4) connected to each longitudinal cable (1) and/or said lateral cable (7), so that the barrier-like members (3) are provided at an appropriate interval in the direction of the height of a mountain with their longer dimensions substantially at right angles to the direction of the height of the mountain, said base point (2) is provided on a slope of the mountain opposite the side of the mountain on which said barrier-like members (3) are provided, and said longitudinal cables (1) are fixed to said base point (2) directly or indirectly via said auxiliary cable (5) across a ridge of the mountain and are connected to each other with said lateral cable (7).

### Claim 56

A mountain-landslide-preventive structure comprising at least two longitudinal cables (1), a base point (2) constituted by a cable that is wound around a mountain, at least one lateral cable (7), and at least two barrier-like members (3), and further and optionally a mooring cable (4), wherein said longitudinal cables (1) are fixed to said base point (2) and are connected to each other with said lateral cable (7), and said barrier-like members (3) are moored directly by using said longitudinal cables (1) and/or said lateral cable (7) or by using said mooring cable (4) connected to each longitudinal cable (1) and/or said lateral cable (7), so that the barrier-like members (3) are provided at an appropriate interval in the direction of the height of the mountain with their longer dimensions substantially at right angles to the direction of the height of the mountain.
