# US 2001/0023576 A1 · High density combined cycle power plant process

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2001/0023576 A1
- Document ID: US20010023576A1
- Status: Published application
- Kind: A1
- Application number: 09/783,693
- Filed: 2001-02-14
- Published: 2001-09-27
- Earliest claimed: 1998-08-31
- Inventors: William S. Rollins III
- Web page: https://patentgrep.com/patent/US20010023576A1

## CPC

- F01K 23/106: {with water evaporated or preheated at different pressures in exhaust boiler}
- F01K 23/105: {Regulating means specially adapted therefor}
- Y02E 20/14: Combined heat and power generation [CHP]
- Y02E 20/16: Combined cycle power plant [CCPP], or combined cycle gas turbine [CCGT]
- Y02P 80/15: On-site combined power, heat or cool generation or distribution, e.g. combined heat and power [CHP] supply
- F01K: STEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES (gas-turbine or jet-propulsion plants F02; nuclear power plants, engine arrangements therein G21D)
- Y02E: REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02P: CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS

## Abstract

A process for increasing the specific output of a combined cycle power plant and providing flexibility in the power plant rating, both without a commensurate increase in the plant heat rate, is disclosed. The present invention demonstrates that the process of upgrading thermal efficiencies of combined cycles can often be accomplished through the strategic use of additional fuel and/or heat input. In particular, gas turbines that exhaust into HRSGs, can be supplemental fired to obtain much higher steam turbine outputs and greater overall plant ratings, but without a penalty on efficiency. This method by and large defines a high efficiency combined cycle power plant that is predominantly a Rankine (bottoming) cycle. Exemplary embodiments of the present invention include a load driven by a topping cycle engine, powered by a topping cycle fluid which exhausts into a heat recovery device.

## Claims

### Claim 1

A combined cycle power plant process comprising the steps of
providing a topping cycle fluid (“TCF”) having a TCF heat capacity (“TCP”) from a topping cycle engine (“TCE”) to a heat recovery device (“HRD”) having an exhaust section,
recovering at least a portion of exhaust heat from the TCE in the HRD,
providing a bottoming cycle fluid (“BCF”) having a BCF heat capacity (“BCP”) from the HRD to a bottoming cycle engine (“BCE”), and
substantially continuously firing the HRD such that the ratio of the flow of TCF to BCF by mass through the HRD exhaust section is maintained substantially equal to the ratio of BCP to TCP.

### Claim 2 (depends on 1)

The process of claim 1 further comprising the step of controlling the HRD to maintain a substantially optimum HRD exhaust temperature.

### Claim 3 (depends on 2)

The process of claim 2, wherein the substantially optimum HRD exhaust temperature is about 180° F.

### Claim 4 (depends on 1)

The process of claim 1 further comprising
driving a topping cycle load (“TCL”) with said TCE, and
driving a bottoming cycle load (“BCL”) with said BCE.

### Claim 5 (depends on 1)

The process of claim 1, wherein said TCE is at least one gas turbine.

### Claim 6 (depends on 1)

The process of claim 1, wherein said HRD is at least one heat recovery steam generator.

### Claim 7 (depends on 1)

The process of claim 1, wherein said BCE is at least one steam turbine.

### Claim 8

A combined cycle power plant process comprising the steps of
providing a topping cycle fluid (“TCF”) having a TCF heat capacity (“TCP”) from a topping cycle engine (“TCE”),
recovering exhaust heat from the TCE in a heat recovery device (“HRD”) having an exhaust section,
supplemental firing the HRD,
providing a bottoming cycle fluid (“BCF”) having a BCF heat capacity (“BCP”) to a bottoming cycle engine (“BCE”), and
controlling the firing of the HRD such that the ratio of the flow of TCF to BCF by mass through the HRD exhaust section is maintained substantially equal to the ratio of BCP to TCP.

### Claim 9 (depends on 8)

The process of claim 8, further comprising the step of controlling the HRD to maintain a substantially optimum HRD exhaust temperature.

### Claim 10 (depends on 9)

The process of claim 9, wherein the substantially optimum HRD exhaust temperature is about 180° F.

### Claim 11 (depends on 8)

The process of claim 8, wherein said TCE is at least one gas turbine.

### Claim 12 (depends on 8)

The process of claim 8, wherein said HRD is at least one heat recovery steam generator.

### Claim 13 (depends on 8)

The process of claim 8, wherein said BCE is at least one steam turbine.

### Claim 14

A combined cycle power plant process comprising:
(1) initializing an HRSG control loop;
(2) determining exhaust gas flow from at least one GT;
(3) determining steam flow required by at least one ST from a particular HRSG;
(4) determining if HRSG required flow is greater than HP economizer optimum flow, and if so, proceeding to step (6);
(5) at least one of (a) reducing GT load and (b) stopping parallel HP feedwater heating, and proceeding to step (1);
(6) at least one of (a) increasing GT load and (b) starting parallel HP feedwater heating operation;
(7) determining if the required steam flow is greater than LP economizer optimum flow, and if so, proceeding to step (9);
(8) stopping parallel LP feedwater heating and then proceeding to step (1); and
(9) starting parallel LP feedwater heating and then proceeding to step (1).

### Claim 15 (depends on 14)

The combined cycle power plant process of claim 14 wherein:
(a) the calculations in step (2) are based on ambient temperature, GT load, and manufacturer's data;
(b) the calculations in step (2) are based on DCS inputs of ambient temperature and GT load;
(c) the calculations in step (3) are based on steam required by ST minus flows from other HSRGs;
(d) the calculations in step (3) are based on DCS inputs of ST steam flow and steam flow from other HSRGs;
(e) the operations in step (5) further comprise modulating valves to provide for optimum HP economizer flow;
(f) the operations in step (6) farther comprise modulating valves to control flows through the HP economizer to obtain optimum outlet temperature;
(g) the operations in step (8) farther comprise opening and closing valve(s) and turning off pump(s) to effectuate stopping parallel LP feedwater heating; and
(h) the operations in step (9) further comprise opening and closing valve(s) and modulating valve(s) to provide for optimum LP economizer flow.

### Claim 16

A combined cycle power plant process comprising:
(1) initializing a plant control loop;
(2) determining load change requirements;
(3) if there is no change in the load, proceeding to step (1);
(4) if there is a decrease in the load, activating a means for decreasing power output, and then proceeding to step (1); and
(5) otherwise, if there is an increase in the load, activating a means for increasing power output, and then proceeding to step (1).

### Claim 17 (depends on 16)

The process of claim 16 wherein said means for increasing power output comprises:
(1) determining if the power plant is in a transitional zone of operation and if so, activating a transition control process and subsequently proceeding to step (13);
(2) determining if all GT(s) are operating, and if so, proceeding to step (8);
(3) determining if all operating GT(s) are at full load, and if so, proceeding to step (5);
(4) increasing the load on at least one GT(s), and then proceeding to step (13);
(5) determining if at least one of an HRSG(s) and ST(s) are at their upper limit, and if not, proceeding to step (7);
(6) activating a transition control process and proceeding to step (13);
(7) increasing at least one of (a) fuel and (b) heat flow to at least one HRSG(s), and proceeding to step (13);
(8) determining if all GT(s) are at full load, and if so, proceeding to step (10);
(9) increasing the load on at least one GT(s), and then proceeding to step (13);
(10) determining if the HRSG(s) or ST(s) are at their upper limit, and if not, proceeding to step (12);
(11) optionally indicating that the power plant is at full capacity and proceeding to step (13);
(12) increasing at least one of (a) fuel and (b) heat flow to at least one HRSG(s) and proceeding to step (13); and
(13) ending the increase power output process.

### Claim 18 (depends on 16)

The process of claim 16 wherein said means for decreasing power output comprises:
(1) determining if the power plant is in a transitional zone of operation and if so, activating a transition control process and subsequently proceeding to step (13);
(2) determining if all GT(s) are operating, and if so, proceeding to step (8);
(3) determining if the HRSG(s) or ST(s) are at their lower limit, and if so, proceeding to step (5);
(4) decreasing at least one of (a) fuel and (b) heat flow to at least one HRSG(s) and proceeding to step (13);
(5) determining if GT(s) are at the transition zone upper limit, and if so, proceeding to step (7);
(6) decreasing the load on at least one GTs until it is shut down, and then proceeding to step (13);
(7) activating a transition control process and proceeding to step (13);
(8) determining if the HRSG(s) or ST(s) are at their lower limit, and if so, proceeding to step (10);
(9) decreasing at least one of (a) fuel and (b) heat input to at least one HRSG(s) and proceeding to step (13);
(10) determining if GT(s) are at the transition zone upper limit, and if not, proceeding to step (12);
(11) activating a transition control process and proceeding to step (13);
(12) decreasing the load on one GT until it is shutdown, and then proceeding to step (13);
(13) ending the decrease power output process.

### Claim 19 (depends on 17)

The process of claim 17 wherein said transition control process comprises:
(1) determining if the load is to be increased, and if so, proceeding to step (5);
(2) determining if the power plant load is at a transition lower limit, and if so, proceeding to step (4);
(3) modulating each GT load and fuel flow to HRSG(s) (ST load) per a set transition protocol and proceeding to step (8);
(4) shutting down at least one GT(s) and proceeding to step (8);
(5) determining if the power plant load is at a transition lower limit, and if not, proceeding to step (7);
(6) starting an additional GT;
(7) modulating each GT load and fuel flow to HRSG(s) (ST load) per a set transition protocol and proceeding to step (8);
(8) terminating the transition control process and returning control to the initiator.

### Claim 20 (depends on 18)

The process of claim 18 wherein said transition control process comprises:
(1) determining if the load is to be increased, and if so, proceeding to step (5);
(2) determining if the power plant load is at a transition lower limit, and if so, proceeding to step (4);
(3) modulating each GT load and fuel flow to HRSG(s) (ST load) per a set transition protocol and proceeding to step (8);
(4) shutting down at least one GT(s) and proceeding to step (8);
(5) determining if the power plant load is at a transition lower limit, and if not, proceeding to step (7);
(6) starting an additional GT;
(7) modulating each GT load and fuel flow to HRSG(s) (ST load) per a set transition protocol and proceeding to step (8);
(8) terminating the transition control process and returning control to the initiator.

### Claim 21

A combined cycle power plant process comprising the steps of
providing a topping cycle fluid (“TCF”) from a topping cycle engine (“TCE”) to a predominantly single pressure heat recovery device (“HRD”),
recovering exhaust heat from the TCF in the HRD,
supplemental firing the HRD,
providing a bottoming cycle fluid (“BCF”) from the HRD to a bottoming cycle engine (“BCE”), and
substantially continuously firing the HRD to optimize the heat recovery from the TCF in the HRD and lower exhaust temperature of the HRD to its optimum level.

### Claim 22 (depends on 21)

The process of claim 21 further comprising the step of controlling the firing such that an increase in the firing rate results in a decrease in TCF exhaust temperature from the HRD.

### Claim 23 (depends on 21)

The process of claim 21 further comprising the steps of
diverting a portion of the BCF after it has exited the BCE and before it enters the HRD to a parallel BCF loop,
extracting a portion of the BCF from the BCE, and
preheating the diverted BCF in the parallel BCF loop using at least one BCF heater that receives heat by BCE extraction.

### Claim 24

A combined cycle power plant process comprising the steps of
(1) maintaining the temperature of a heat recovery steam generator (“HRSG”) exhaust gas, said HRSG having an associated gas turbine (“GT”), at an optimum level by controlling the rate of supplemental firing of the HRSG when its associated GT load is between 0 and about 100% of its nominal power output capacity, and
(2) for additional capacity beyond step (1), increasing plant capacity through additional supplemental firing and maintaining the temperature of the HRSG exhaust gas at an optimum level by controlling the rate of flow of feedwater through the HRSG when its associated GT load is at about 100% of its nominal power output capacity.

### Claim 25

A combined cycle power plant process comprising:
providing a topping cycle fluid (“TCF”) from a topping cycle engine (“TCE”) to a heat recovery device (“HRD”);
recovering exhaust heat from the TCF in the HRD;
substantially continuously supplemental firing the HRD;
providing a bottoming cycle fluid (“BCF”) from the HRD to a bottoming cycle engine (“BCE”); and
modulating the rate of BCF flow through the HRD to optimize the heat recovery from the TCF in the HRD and lower exhaust temperature of the HRD to its optimum level.

### Claim 26 (depends on 25)

The combined cycle power plant process of claim 25 wherein said TCE includes at least one gas turbine (“GT”), wherein said BCE includes at least one steam turbine (“ST”), and wherein said HRD includes at least one heat recovery steam generator (“HRSG”).

### Claim 27 (depends on 26)

The combined cycle power plant process of claim 26 further including controlling the substantially continuous supplemental firing of the HRSG to modulate the rate of feedwater flow through the HRSG.

### Claim 28 (depends on 26)

The combined cycle power plant process of claim 26 further including diverting feedwater to a parallel feedwater loop and preheating said parallel feedwater using ST extraction steam.

### Claim 29 (depends on 26)

The combined cycle power plant process of claim 26 wherein said HRSG produces steam at a single pressure.

### Claim 30 (depends on 26)

The combined cycle power plant process of claim 26 wherein said HRSG produces high pressure steam predominantly at supercritical pressure at rated combined cycle plant output.

### Claim 31

A combined cycle power plant process comprising:
providing a topping cycle fluid (“TCF”) from a topping cycle engine (“TCE”) to a predominantly single pressure level heat recovery device (“HRD”);
recovering exhaust heat from the TCF in the HRD;
supplemental firing the HRD;
providing a bottoming cycle fluid (“BCF”) from the HRD at a predominantly single pressure level to a bottoming cycle engine (“BCE”); and
maintaining a TCF exhaust temperature of said HRD at an optimum level.

### Claim 32 (depends on 31)

The combined cycle power plant process of claim 31 wherein said exhaust temperature of said HRD is maintained at said optimum level by controlling BCF flow through the HRD.

### Claim 33 (depends on 31)

The combined cycle power plant process of claim 31 wherein said exhaust temperature of said HRD is maintained at said optimum level by controlling supplemental firing of said HRD.

### Claim 34 (depends on 33)

The combined cycle power plant process of claim 33 wherein the supplemental firing is substantially continuous.

### Claim 35 (depends on 33)

The combined cycle power plant process of claim 33 wherein total supplemental firing input at combined cycle plant rated capacity is at least about 30% of the energy input to said TCE.

### Claim 36

A method of operating a combined cycle power plant comprising at least one gas turbine (“GT”), at least one steam turbine (“ST”), and at least one heat recovery steam generator (“HRSG”), said method comprising:
operating said GT to produce shaft work and exhaust gas;
passing said exhaust gas through said HRSG;
adding supplemental heat to said HRSG;
producing steam at said HRSG using heat from said exhaust gas and said supplemental heat;
passing said steam to said ST;
operating said ST to produce shaft work;
converting said steam to feedwater;
passing said feedwater to said HRSG; and
controlling flow of said feedwater through said HRSG to optimize heat recovery in said HRSG.

### Claim 37 (depends on 36)

The method of claim 36 wherein said steam is produced at said HRSG at substantially a single pressure level.

### Claim 38 (depends on 36)

The method of claim 36 wherein said steam produced at said HRSG is high pressure steam predominantly at supercritical pressure at rated combined cycle plant output.

### Claim 39 (depends on 36)

The method of claim 36 wherein said flow of feedwater through said HRSG is controlled by modulating the rate of adding said supplemental heat to said HRSG.

### Claim 40 (depends on 36)

The method of claim 36 further including diverting at least some of said feedwater to a parallel feedwater loop and supplying said diverted feedwater back to said HRSG.

### Claim 41 (depends on 40)

The method of claim 40 further including preheating said feedwater in said parallel feedwater loop using ST extraction steam.

### Claim 42 (depends on 40)

The method of claim 40 further including preheating said feedwater in said parallel feedwater loop using energy from at least one of generator losses and other auxiliaries.

### Claim 43 (depends on 36)

The method of claim 36 wherein adding supplemental heat to said HRSG includes substantially continuously supplemental firing said HRSG.

### Claim 44 (depends on 43)

The method of claim 43 wherein said flow of feedwater through said HRSG is controlled by modulating a rate of said supplemental firing.