# US 2001/0022023 A1 · Method of manufacturing an article by diffusion bonding and superplastic forming

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2001/0022023 A1
- Document ID: US20010022023A1
- Status: Published application
- Kind: A1
- Application number: 09/799,044
- Filed: 2001-03-06
- Published: 2001-09-20
- Earliest claimed: 2000-03-18
- Assignees: ROLLS-ROYCE plc
- Inventors: Michael J. Wallis
- Web page: https://patentgrep.com/patent/US20010022023A1

## CPC

- B21D 26/055: Blanks having super-plastic properties
- B21D 53/045: {by inflating partially united plates}
- B23K 20/023: {Thermo-compression bonding}
- B23K 20/18: Zonal welding by interposing weld-preventing substances between zones not to be welded
- F01D 5/147: {Construction, i.e. structural features, e.g. of weight-saving hollow blades (F01D5/148, F01D5/16 and F01D5/20 take precedence; blade shape F01D5/141; blades with cooling or heating channels or cavities F01D5/18; heating, heat-insulating or cooling means on blades F01D5/18)}
- B23K 2101/001: {Turbines}
- F05D 2220/324: to drive unshrouded, low solidity propeller
- Y10T 29/49336: Blade making
- Y10T 29/49339: Hollow blade
- Y10T 29/49341: with cooling passage
- B21D: WORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL (working or processing of wire B21F)
- B23K: SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
- F01D: NON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES (machines or engines for liquids F03; non-positive displacement pumps F04D)
- F05D: INDEXING SCHEME FOR ASPECTS RELATING TO NON-POSITIVE-DISPLACEMENT MACHINES OR ENGINES, GAS-TURBINES OR JET-PROPULSION PLANTS
- Y10T: TECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION

## Abstract

A method of manufacturing a gas turbine engine fan blade (10) comprises forming three metal workpieces (30, 32, 34). The metal workpieces (30, 32, 34) are assembled into a stack (36) so that the flat surfaces (38, 42, 46, 48) are in mating abutment. Heat and pressure is applied across the thickness of the metal workpieces (30, 32, 34) to diffusion bond the metal workpieces (30, 32, 34) together to form an integral structure (80). The integral structure (80) is upset forged at one end (58) to produce an increase in thickness (82) for forming the blade root (26). The upset forged integral structure (80) is then hot creep formed and superplastically formed to produce the required aerofoil shape and the thickened end (82) is machined to form the blade root (26). The method enables thinner metallic workpieces with better microstructure to be used and increases the yield of metallic workpieces.

## Claims

### Claim 1

A method of manufacturing an article of predetermined finished profile by diffusion bonding and superplastic forming at least two metal workpieces comprising the steps of:
(a) forming at least two metal workpieces, each metal workpiece has at least one surface,
(b) applying a stop off material to prevent diffusion bonding to preselected areas of at least one of the surfaces of at least one of the at least two metal workpieces,
(c) assembling the at least two metal workpieces into a stack relative to each other so that the surfaces are in mating abutment,
(d) applying heat and pressure across the thickness of the at least two metal workpieces to diffusion bond the at least two metal workpieces together in areas other than the preselected areas to form an integral structure,
(e) forging one end of the integral structure to produce a region of increased thickness,
(f) heating the integral structure and internally pressurising the integral structure to cause the preselected area of at least one of the metal workpieces to be hot formed to produce a hollow article of predetermined shape.

### Claim 2 (depends on 1)

A method as claimed in claim 1 wherein the method comprises after step (e) and before step (f) placing the integral structure in a hot creep forming die, heating the integral structure while it is within the die to cause the integral structure to be hot creep formed on the convex surface of the die.

### Claim 3 (depends on 1)

A method as claimed in claim 1 wherein step (a) comprises forming a first metallic workpiece, a second metallic workpiece and a third metallic workpiece, the third metallic workpiece having two flat surfaces, and step (c) comprises assembling the three metal workpieces into the stack relative to each other so that third metal workpiece is between the first and second metal workpieces and the flat surfaces are in mating abutment.

### Claim 4 (depends on 3)

A method as claimed in claim 3 wherein the hollow article is selected from the group comprising a fan blade and a compressor blade.

### Claim 5 (depends on 1)

A method as claimed in claim 1 wherein step (a) comprises forming a first metallic workpiece and a second metallic workpiece.

### Claim 6 (depends on 5)

A method as claimed in claim 5 wherein the hollow article is selected from the group comprising a fan outlet guide vane, a compressor blade and a fan blade.

### Claim 7 (depends on 1)

A method as claimed in claim 1 wherein after diffusion bonding the stack of workpieces and before superplastically forming the integral structure, the integral structure is heated and loads are applied to opposite ends of the integral structure to twist one end relative to the other end to contour the integral structure to a predetermined shape.

### Claim 8 (depends on 7)

A method as claimed in claim 7 wherein after twisting the integral structure and before superplastic forming the integral structure, the contoured integral structure is internally pressurised to break the adhesive bond between the stop off material and the at least one workpiece in the preselected area.

### Claim 9 (depends on 1)

A method as claimed in claims 1 wherein after diffusion bonding the stack of workpieces and before superplastically forming the integral structure, the integral structure is internally pressurised to break the adhesive bond between the stop off material and the at least one workpiece in the preselected area.

### Claim 10 (depends on 9)

A method as claimed in claim 9 wherein after internally pressurising the integral structure to break the adhesive bond and before internally pressurising the integral structure to superplastically form at least one metal workpiece, the interior of the integral structure is sequentially evacuated and supplied with inert gas to remove oxygen from the interior of the integral structure.

### Claim 11 (depends on 1)

A method as claimed in claim 1 wherein after the metal workpieces are arranged in a stack and before the metal workpieces are diffusion bonded together to form an integral structure, the edges of the metal workpieces are sealed.

### Claim 12 (depends on 11)

A method as claimed in claim 11 wherein the edges of the metal workpieces are welded together.

### Claim 13 (depends on 1)

A method as claimed in claim 1 where the metal workpieces are made of a titanium alloy, the metal workpieces are heated to a temperature equal to, or greater than, 850° C. and the pressure applied is equal to, or greater than, 20×105 Nm−2 to diffusion bond the workpieces together to form an integral structure.

### Claim 14 (depends on 13)

A method as claimed in claim 13 wherein the metal workpieces are heated to a temperature between 900° C. and 950° C. and the pressure applied is between 20×105 Nm−2 and 30×105 Nm−2.

### Claim 15 (depends on 1)

A method as claimed in claim 1 wherein the integral structure is heated to a temperature equal to, or greater than, 850° C. to superplastically form the integral structure.

### Claim 16 (depends on 15)

A method as claimed in claim 15 wherein the integral structure is heated to a temperature between 900° and 950° C.

### Claim 17 (depends on 2)

A method as claimed in claim 2 wherein the integral structure is hot creep formed at a temperature equal to, or greater than, 740° C.

### Claim 18 (depends on 1)

A method as claimed in claim 1 wherein step (e) comprises upset forging.

### Claim 19 (depends on 1)

A method as claimed in claim 1 comprising machining the region of increased thickness.

### Claim 20 (depends on 19)

A method as claimed in claim 19 wherein the region of increased thickness is machined to form a dovetail root or a fir-tree root.

### Claim 21 (depends on 1)

A method as claimed in claim 1 wherein step (e) comprises heating the integral structure to a predetermined temperature before forging.

### Claim 22 (depends on 21)

A method as claimed in claim 21 wherein the integral structure is heated to a temperature between 900° C. and 950° C.

### Claim 23 (depends on 1)

A method as claimed in claim 1 wherein in step (a) each of the at least two metal workpieces has at least one flat surface.

### Claim 24 (depends on 1)

A method as claimed in claim 1 wherein step (a) comprises forming at least one longitudinally tapering metal workpiece and step (e) comprises upset forging the thicker end of the metal workpiece.

### Claim 25 (depends on 24)

A method as claimed in claim 24 wherein step (a) comprises forming two longitudinally tapering metal workpieces, step (c) comprises arranging the thicker ends of the metal workpieces at one end of the stack and step (e) comprises upset forging the thicker ends of the metal workpieces.
