Optimization of inverter and capacitor bank sizing for reactive power management
AssigneeBrightnight Power LLC
InventorsLucas Harvey, Cédric Leroy, Benjamin Calvin Bourne
Life of this patent
Estimating the term…
Loading patent…
AssigneeBrightnight Power LLC
InventorsLucas Harvey, Cédric Leroy, Benjamin Calvin Bourne
Estimating the term…
A non-transitory computer-readable medium stores instructions that, when executed by processors, cause them to configure an electrical generation facility to meet a power factor requirement by determining a range of inverter counts, generating combinations of inverter counts and power factor settings based on manufacturer specifications, filtering combinations where active power output exceeds a peak output limit, calculating total reactive power contribution for each combination, determining plant-level power factor based on losses across facility components, determining capacitor bank size to address remaining reactive power gaps, generating a configuration matrix comprising inverter count, power factor setting, and capacitor bank size, applying an optimization algorithm to determine deployment factors, and selecting a configuration based on those factors.
A non-transitory computer-readable medium storing instructions that, when executed by one or more processors, cause the one or more processors to configure an electrical generation facility to meet a power factor requirement at a point of interconnection by:
A method for configuring an electrical generation facility to meet a power factor requirement at a point of interconnection, the method comprising: