Systems and methods for well placement in stable in-situ stress for horizonal drilling
AssigneeSaudi Arabian Oil Company
InventorsHussain Al Abdrabalnabi, Mohammad Asiri
Life of this patent
Estimating the term…
Loading patent…
AssigneeSaudi Arabian Oil Company
InventorsHussain Al Abdrabalnabi, Mohammad Asiri
Estimating the term…
Among other things, methods and systems are described for drilling a target wellbore in a hydrocarbon bearing (HCB) formation. A method involves selecting a plurality of offset wells in proximity of a location of the target wellbore, where the plurality of offset wells are in different directions with respect to the location; for each offset well: generating a porosity and in-situ stress profile for a first sub-formation of the HCB formation; and selecting, based on the porosity and in-situ stress profile, stable-stress window in the first sub-formation; integrating the stable-stress windows from the plurality of offset wells with seismic data associated with the first sub-formation; generating, based on the integrated data, a three-dimensional (3D) stress stable horizon in the first sub-formation; and generating, based on the 3D stress stable horizon, a drilling trajectory for a drilling operation in the first sub-formation.
A method for drilling a target wellbore in a hydrocarbon bearing (HCB) formation, the method comprising:
A system for drilling a target wellbore in a hydrocarbon bearing (HCB) formation, the system comprising:
A non-transitory computer storage medium encoded with instructions that, when executed by one or more computers, cause the one or more computers to perform operations for drilling a target wellbore in a hydrocarbon bearing (HCB) formation, the operations comprising:
Dependencies are inferred from the claim text.