Estimating an upgraded power curve
AssigneeSiemens Gamesa Renewable Energy Innovation & Technology S.L.
InventorsIgnacio Fernandez Romero, Alexander Meinicke, Pablo Desco Santos
Life of this patent
Estimating the term…
Abstract
A method of estimating a second power curve of a wind turbine regarding a second operational configuration includes: receiving power output data pertaining to a first operational configuration, in particular reference operational configuration; receiving power data relating to power output pertaining to the second operational configuration; deriving the second power curve using the power output data pertaining to the first operational configuration, the power output data pertaining to the second operational configuration and a first power curve of the first operational configuration.
Claims15
A method of estimating a second power curve of a wind turbine regarding a second operational configuration, the method comprising:
- receiving power output data (a, b, pertaining to a first operational configuration;
- receiving power data-relating to power output pertaining to the second operational configuration;
- deriving the second power curve-using the power output data fab pertaining to the first operational configuration, the power output data pertaining to the second operational configuration and a first power curve of the first operational configuration, wherein receiving power data relating to a power output pertaining to the second operational configuration comprises:
- receiving power data relating to a power output of at least one first wind turbine operated according to the second operational configuration in a first time interval;
- receiving power output data pertaining to the first operational configuration comprises:
- receiving power data b relating to a power output of at least one second wind turbine operated according to the first operational configuration in the first time interval, the method further comprising:
- receiving power data relating to a power output of the first wind turbine operated according to the first operational configuration in a second time interval,
- receiving power data relating to a power output of the second wind turbine operated according to the second operational configuration in the second time interval;
- wherein deriving the second power curve is based on:
- the power data relating to a power output of the first wind turbine operated according to the second operational configuration in the first time interval;
- the power data-relating to a power output of the second wind turbine operated according to the first operational configuration in the first time interval,
- the power data relating to a power output of the first wind turbine operated according to the first operational configuration in the second time interval;
- the power data relating to a power output of the second wind turbine operated according to the second operational configuration in the second time interval;
- and
- the first power curve,
- wherein the first wind turbine and the second wind turbine are operated at the same time interval always in different operational configurations, wherein deriving the second power curve comprises:
- deriving a first estimate of the second power curve employing a calculation scheme,
- the calculation scheme having as a first input the power data relating to power output of the first wind turbine operated according to the second operational configuration in the first time interval;
- the calculation scheme having as a second input the power data relating to power output of the second wind turbine operated according to the first operational configuration in the first time interval,
- wherein the calculation scheme further uses the first power curve, to derive the first estimate of the second power curve,
- wherein the second power curve is derived further based on the first estimate of the second power curve,
- wherein the calculation scheme derives a difference between data supplied to the first input and data supplied to the second input.
An arrangement for estimating a second power curve of a wind turbine regarding a second operational configuration, the arrangement comprising a processor, having an input adapted:
- to receive power output data pertaining to a first operational configuration;
- to receive power data relating to power output pertaining to the second operational configuration;
- to derive the second power curve using the power output data pertaining to the first operational configuration, the power output data pertaining to the second operational configuration and a first power curve of the first operational configuration, wherein deriving the second power curve comprises:
- deriving a first estimate of the second power curve employing a calculation scheme,
- the calculation scheme having as a first input the power data relating to power output of the first wind turbine operated according to the second operational configuration in the first time interval;
- the calculation scheme having as a second input the power data relating to power output of the second wind turbine operated according to the first operational configuration in the first time interval,
- wherein the calculation scheme further uses the first power curve, to derive the first estimate of the second power curve,
- wherein the second power curve is derived further based on the first estimate of the second power curve, the arrangement being adapted to control or carry out a method according to one of the preceding claims.
Dependencies are inferred from the claim text.