Assessing and remediating well clogging from precipitate, systems, apparatuses, and methods
AssigneeSevee & Maher Engineers, Inc.
InventorBruce Austin Fowler
Life of this patent
Estimating the term…
Abstract
Methods and systems are disclosed to assess clogging associated with a first well. The first well has a well screen or an open borehole in bedrock. A water sample is received from the first well during an ON state. Water is pumped from the first well during the ON state. A first oxidation reduction potential measurement and a first pH measurement are made on the water sample. First clogging specific information is determined for a first mineral or metal utilizing the first oxidation reduction potential measurement, the first pH measurement, and an Eh vs pH phase diagram for the first mineral or metal.
Claims63
A system to determine precipitation of a first mineral or metal out of solution in a first water well, comprising:
- a well water analysis device, the well water analysis device further comprising:
- an aquifer chemistry module, the aquifer chemistry module to produce a measurement of oxidation reduction potential of a water sample from the first water well, wherein the water sample is taken from the first water well while water is produced from the first water well, the first water well having a well screen installed therein;
- and a measurement of pH of water taken from the first water well;
- an Eh-pH phase diagram for the first mineral or metal;
- a data processing system configured to accept the measurement of oxidation reduction potential and the measurement of pH;
- and
- a non-transient computer readable medium containing executable computer program instructions which, when executed by the data processing system, cause the data processing system to perform steps comprising:
- comparing the measurement of oxidation reduction potential and the measurement of pH with one or both of:
- (a) a precipitation zone on the Eh-pH phase diagram for the first mineral or metal;
- and
- (b) a border of a precipitation zone on the Eh-pH phase diagram;
- and
- determining the first mineral or metal is precipitating out of solution, the determining is based on the comparing, in response to the determining the system is configured to be reconfigured with the addition of a custom extended pump sleeve, the custom extended pump sleeve having a first end and a second end, the first end is attached to a well pump above a water inlet for the well pump, the second end extends down below a motor configured with the well pump.
A system to determine precipitation of a first mineral or metal out of solution in a first water well, comprising:
- a well water analysis device, the well water analysis device further comprising:
- an aquifer chemistry module, the aquifer chemistry module to produce a measurement of oxidation reduction potential of a water sample from the first water well, wherein the water sample is taken from the first water well while water is produced from the first water well, the first water well having a well screen installed therein;
- and a measurement of pH of water taken from the first water well;
- an Eh-pH phase diagram for the first mineral or metal;
- a data processing system configured to accept the measurement of oxidation reduction potential and the measurement of pH;
- and
- a non-transient computer readable medium containing executable computer program instructions which, when executed by the data processing system, cause the data processing system to perform steps comprising:
- comparing the measurement of oxidation reduction potential and the measurement of pH with one or both of:
- (a) a precipitation zone on the Eh-pH phase diagram for the first mineral or metal;
- and
- (b) a border of a precipitation zone on the Eh-pH phase diagram;
- and
- determining the first mineral or metal is precipitating out of solution, the determining is based on the comparing, in response to the determining a frequency of dewatering the first water well is adjusted.
A system to determine precipitation of a first mineral or metal out of solution in a first water well, comprising:
- a well water analysis device, the well water analysis device further comprising:
- an aquifer chemistry module, the aquifer chemistry module to produce a measurement of oxidation reduction potential of a water sample from the first water well, wherein the water sample is taken from the first water well while water is produced from the first water well, the first water well having a well screen installed therein;
- and a measurement of pH of water taken from the first water well;
- an Eh-pH phase diagram for the first mineral or metal;
- a data processing system configured to accept the measurement of oxidation reduction potential and the measurement of pH;
- and
- a non-transient computer readable medium containing executable computer program instructions which, when executed by the data processing system, cause the data processing system to perform steps comprising:
- comparing the measurement of oxidation reduction potential and the measurement of pH with one or both of:
- (a) a precipitation zone on the Eh-pH phase diagram for the first mineral or metal;
- and
- (b) a border of a precipitation zone on the Eh-pH phase diagram;
- and
- determining the first mineral or metal is precipitating out of solution, the determining is based on the comparing, in response to the determining, the system is configured to be reconfigured for a treatment with an acid mixture, wherein the first water well is placed in an OFF state, then the acid mixture is surged in the well screen, then the first water well remains in the OFF state with the addition of the acid mixture for a first period of time, after passage of the first period of time the first water well is pumped off to remove the acid mixture.
A method to determine a first mineral or metal is precipitating out of solution in a first water well, the first water well having a well screen or an open borehole in bedrock comprising:
- receiving a water sample from the first water well the water sample is taken from the first water well while water is produced from the first water well;
- making a first oxidation reduction potential measurement on the water sample;
- performing a first pH measurement on the water sample;
- comparing the first oxidation reduction potential measurement and the first pH measurement with one or both of:
- (a) a precipitation zone on an Eh-pH phase diagram for the first mineral or metal;
- and
- (b) a border of a precipitation zone on the Eh-pH phase diagram;
- and
- determining the first mineral or metal is precipitating out of solution, the determining is based on the comparing, in response to the determining, the method further comprising:
- deepening a water intake location for the first water well using a custom extended pump sleeve.
A method to determine a first mineral or metal is precipitating out of solution in a first water well, the first water well having a well screen or an open borehole in bedrock, comprising:
- receiving a water sample from the first water well the water sample is taken from the first water well while water is produced from the first water well;
- making a first oxidation reduction potential measurement on the water sample;
- performing a first pH measurement on the water sample;
- comparing the first oxidation reduction potential measurement and the first pH measurement with one or both of:
- (a) a precipitation zone on an Eh-pH phase diagram for the first mineral or metal;
- and
- (b) a border of a precipitation zone on the Eh-pH phase diagram;
- and
- determining the first mineral or metal is precipitating out of solution, the determining is based on the comparing, the method further comprising:
- reducing a frequency of dewatering for the first water well.
A method to determine a first mineral or metal is precipitating out of solution in a first water well, the first water well having a well screen or an open borehole in bedrock, comprising:
- receiving a water sample from the first water well the water sample is taken from the first water well while water is produced from the first water well;
- making a first oxidation reduction potential measurement on the water sample;
- performing a first pH measurement on the water sample;
- comparing the first oxidation reduction potential measurement and the first pH measurement with one or both of:
- (a) a precipitation zone on an Eh-pH phase diagram for the first mineral or metal;
- and
- (b) a border of a precipitation zone on the Eh-pH phase diagram;
- and
- determining the first mineral or metal is precipitating out of solution, the determining is based on the comparing, in response to the determining, the method further comprising:
- dissolving at least one mineral or metal from the well screen installed in the first water well, in sequential order the dissolving further comprising:
- adding an acid mixture to the first water well when the first water well is in an OFF state;
- surging the acid mixture into the well screen;
- waiting a first period time;
- and
- pumping off the first water well to remove the acid mixture.
Dependencies are inferred from the claim text.