Pinhole repair method using epoxy and expandable mesh
AssigneeSaudi Arabian Oil Company
InventorsGhassan Adel Alaseri, Raed Alahmdi, Faisal Alissa, AbdulWahab Ghamdi
Life of this patent
Estimating the term…
Loading patent…
AssigneeSaudi Arabian Oil Company
InventorsGhassan Adel Alaseri, Raed Alahmdi, Faisal Alissa, AbdulWahab Ghamdi
Estimating the term…
A method to repair well completion components includes evaluating tubing-casing annulus (TCA) communication to locate a leak, determining a placement depth, preparing a tubing mesh stent assembly and one or more epoxy compounds at a well surface, performing workover operations, installing a retrievable plug, running the tubing mesh stent assembly into the well to the leak depth, expanding the tubing mesh stent assembly, setting the tubing mesh stent assembly in place, pumping a first reactive epoxy-containing compound through the tubing mesh stent assembly to fill the leak, allowing all epoxy-containing compounds to react for up to 24 hours or more to cure, reversing workover operations to resume normal production, and testing the well under pressure to ensure integrity at normal operating conditions. A system for repairing leaks in well completion components includes a tubing mesh stent assembly including an upper section, a middle section, and a lower section.
A method to repair well completion components, the method comprising:
A system for repairing leaks in well completion components, the system comprising:
Dependencies are inferred from the claim text.