# US 12,650,244 B2 · Heating systems

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 12,650,244 B2
- Document ID: US12650244B2
- Status: Granted
- Kind: B2
- Application number: 18/266,628
- Filed: 2021-12-10
- Published: 2024-02-08
- Granted: 2026-06-09
- Earliest claimed: 2020-12-10
- Assignees: Mixergy Limited
- Applicants: Mixergy Limited
- Inventors: Peter Armstrong; Geraint Lloyd; Christopher Randall
- Web page: https://patentgrep.com/patent/US12650244B2

## CPC

- F24H 4/04: Storage heaters
- F24H 15/168: Reducing the electric power demand peak
- F24D 3/18: using heat pumps
- F24D 19/1039: {the system uses a heat pump}
- F24D 19/1063: {counting of energy consumption}
- F24H 7/002: {using electrical energy supply}
- F24H 9/2021: {Storage heaters}
- F24H 15/223: in the water storage tank
- F24H 15/231: at the evaporator
- F24H 15/232: at the condenser
- F24H 15/254: Room temperature
- F24H 15/375: Control of heat pumps
- F24H 15/421: using pre-stored data
- H02J 3/00142: {Oscillations concerning frequency}
- H02J 3/14: by switching loads on to, or off from, the networks, e.g. progressively balanced loading
- H02J 2105/42: Home appliances
- H02J 2105/52: for limitation of the power consumption in the networks or in one section of the networks, e.g. load shedding or peak shaving
- Y02B 70/30: Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
- Y02B 70/3225: Demand response systems, e.g. load shedding, peak shaving
- Y04S 20/222: Demand response systems, e.g. load shedding, peak shaving
- Y04S 20/242: Home appliances
- Y04S 20/244: the home appliances being or involving heating ventilating and air conditioning [HVAC] units
- F24H: FLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL (steam generation F22)
- F24D: DOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR (using steam or condensate extracted or exhausted from steam engine plants for heating purposes F01K17/02)
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- Y02B: CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y04S: SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS

## Abstract

A heating system (100), a controller (110) for a heating system and a method of controlling a heating system (100) suitable for responding to grid stress events are disclosed. A heating system (100) comprises a tank (104) for holding water; a heat pump (102) arranged to provide heat to the tank (104); an electric heating element (108) disposed in the tank for heating water; and, a controller (110) configured to: control electric power from an electric power grid to the heat pump (102) and the electric heating element (108); detect a grid stress event; determine a heat pump energy penalty for providing heat in response to the grid stress event under a present operating condition; and, vary, in dependence on the determined heat pump energy penalty, a power provided to the electric heating element (108).

## Claims

### Claim 1

A heating system comprising:
a tank for holding water;
a heat pump arranged to provide heat to the tank;
an electric heating element disposed in the tank for heating water; and,
a controller configured to:
control electric power from an electric power grid to the heat pump and the electric heating element;
detect a grid stress event;
determine a heat pump energy penalty incurred in starting up the heat pump for providing heat in response to the grid stress event under a present operating condition; and,
vary, in dependence on the determined heat pump energy penalty, a power provided to the electric heating element.

### Claim 2 (depends on 1)

The system of claim 1, further comprising one or more of:
a mains sensor arranged to measure a mains current frequency for detecting a grid stress event;
a voltmeter arranged to measure a mains voltage for detecting a grid stress event; and
a heat meter arranged to measure a heat flow of the heating system for determining the heat pump energy penalty in dependence on a characteristic performance profile of the heat pump.

### Claim 3 (depends on 1)

The system of claim 1 wherein the grid stress event comprises a change in a mains current frequency or a change in a mains voltage.

### Claim 4 (depends on 1)

The system of claim 1 wherein the controller is configured to determine a predicted duration of the grid stress event.

### Claim 5 (depends on 4)

The system of claim 4 wherein the predicted duration of the grid stress event is determined based on a model.

### Claim 6 (depends on 1)

The system of claim 1 wherein the controller is configured to determine the heat pump energy penalty in dependence on a known or predicted duration of the grid stress event.

### Claim 7 (depends on 1)

The system of claim 1 wherein the controller is further configured to:
determine a user heating requirement;
determine the heat pump energy penalty in dependence on the user heating requirement; and
select, in dependence on the determined heat pump energy penalty, either the heat pump or the electric heating element to satisfy the user heating requirement.

### Claim 8 (depends on 7)

The system of claim 7 wherein the user heating requirement is a user heating schedule and/or a user hot water demand schedule.

### Claim 9 (depends on 1)

The system of claim 1 wherein the controller comprises an optimisation algorithm configured to determine the heat pump energy penalty, optionally wherein the optimisation algorithm is a simplex algorithm or a recurrent neural network.

### Claim 10 (depends on 1)

The system of claim 1 wherein the present operating condition comprises one or more temperature measurements comprising:
a temperature of a condenser of the heat pump;
a temperature of an evaporator of the heat pump;
a temperature of a space to be heated by the heating system;
a temperature of a space to be cooled by the heating system;
a temperature of hot water held in the tank;
a temperature of hot water at a point along the heating system; and,
a temperature of refrigerant at a point along the heating system.

### Claim 11 (depends on 1)

The system of claim 1 wherein the controller is configured to determine the heat pump energy penalty in dependence on a fatigue factor of the heat pump.

### Claim 12 (depends on 1)

The system of claim 1 wherein the controller is configured to determine the heat pump energy penalty in dependence on a characteristic performance profile of the heat pump.

### Claim 13 (depends on 1)

The system of claim 1 wherein the system comprises one or more heat meters arranged to measure a heat flow of the heating system, wherein the one or more heat meters are configured to measure one or more of:
(a) a heat flow from the heat pump to a space heating system;
(b) a heat flow from an air-conditioning system to the heat pump;
(c) a heat flow from the heat pump to the tank; and
(d) a heat flow of any combination of (a)-(c).

### Claim 14 (depends on 1)

The system of claim 1 wherein the grid stress event comprises a signal received from a grid operator, optionally wherein the signal is a prompt to increase or decrease an energy usage, optionally for a duration of time.

### Claim 15 (depends on 1)

The system of claim 1 wherein the controller is configured to receive data from a remote server, optionally wherein the remote server is a remote server of a grid operator and the data comprises a signal from the grid operator associated with a grid stress event.

### Claim 16 (depends on 1)

The system of claim 1 wherein the controller is configured to vary the power to the heat pump in dependence on the heat pump energy penalty.

### Claim 17 (depends on 1)

The system of claim 1 wherein the controller is configured to vary the power to the electric heating element by controlling an on-off switching device.

### Claim 18 (depends on 1)

The system of claim 1 further comprising:
a buffer vessel arranged between the heat pump and the tank for storing fluid circulated by the heat pump; and
a buffer vessel heater for directly heating fluid in the buffer vessel,
wherein the controller is further configured to control electric power from the electric power grid to the buffer vessel heater and vary, in dependence on the determined heat pump energy penalty, a power provided to the buffer vessel heater.

### Claim 19 (depends on 18)

The system of claim 18 wherein the controller is further configured to:
determine a user heating requirement;
determine the heat pump energy penalty in dependence on the user heating requirement; and
select, in dependence on the determined heat pump energy penalty, the heat pump, the electric heating element or heat stored in the buffer vessel to satisfy the user heating requirement.

### Claim 20

A heating system comprising:
a water heating system for heating potable water and/or a space heating system;
a heat pump arranged to provide heat to the water heating system and/or a space heating system;
a buffer vessel arranged between the heat pump and the water heating system or space heating system for storing fluid circulated by the heat pump;
a buffer vessel heater for directly heating fluid in the buffer vessel;
a controller configured to:
control electric power from an electric power grid to the heat pump and the buffer vessel heater;
detect a grid stress event;
determine a heat pump energy penalty incurred in starting up the heat pump for providing heat in response to the grid stress event under a present operating condition; and,
vary, in dependence on the determined heat pump energy penalty, a power provided to the buffer vessel heater.

### Claim 21 (depends on 20)

The system of claim 20 wherein the buffer vessel heater comprises an electric heating element disposed in the buffer vessel for heating fluid in the buffer vessel.

### Claim 22

A controller for a heating system comprising:
a grid stress event detector for detecting a grid stress event;
a data receiver for receiving sensor data;
a processor configured to determine a heat pump energy penalty incurred in starting up the heat pump for providing heat in response to a grid stress event in dependence on received sensor data; and,
a power control module configured to vary the power provided to an electric heating element in dependence on the heat pump energy penalty.
