HVAC systems with start time optimization
AssigneeTyco Fire & Security GmbH
InventorsMichael J. Risbeck, Camille M. Aucoin, Benjamin J. Sveum, Christopher R. Amundson, Matthew J. Asmus
Life of this patent
Estimating the term…
Loading patent…
AssigneeTyco Fire & Security GmbH
InventorsMichael J. Risbeck, Camille M. Aucoin, Benjamin J. Sveum, Christopher R. Amundson, Matthew J. Asmus
Estimating the term…
A heating, ventilating, or air conditioning (HVAC) system that operates equipment to affect a physical property of an environment. The HVAC system obtains schedules including two time periods during which a criterion for the physical property of a environment is to be satisfied (for example, occupied time periods) and a third time period occurring between the two time periods during which the criterion need not be satisfied (for example, unoccupied time periods). The HVAC system performs one prediction of the physical property forward from the end of the middle time period and one prediction backward from the last of the three time periods to determine a transition period during the second time period within which to operate the equipment by finding an intersection of the predictions. The HVAC system controls the equipment during the transition time period to satisfy the criterion at the beginning of the last time period.
A heating, ventilating, or air conditioning (HVAC) system that operates HVAC equipment to affect at least one physical property of an environment of a building zone, the HVAC system comprising:
A method for controlling HVAC equipment to affect at least one physical property of an environment of a building zone, the method comprising:
One or more non-transitory computer-readable media having instructions stored thereon that, when executed by one or more processors, cause the one or more processors to perform operations comprising:
Dependencies are inferred from the claim text.