Gas plant hydrocarbon recovery management system and process
AssigneeSaudi Arabian Oil Company
InventorsYousif Alabkary, Mishar Kumar Paul, Fahad Dhahri, Khalid Alfahadi, Khalid A. Alsaadi
Life of this patent
Estimating the term…
Loading patent…
AssigneeSaudi Arabian Oil Company
InventorsYousif Alabkary, Mishar Kumar Paul, Fahad Dhahri, Khalid Alfahadi, Khalid A. Alsaadi
Estimating the term…
A gas plant hydrocarbon recovery management system includes a hydrocarbon blowdown header flowline for receiving a hydrocarbon drainage composition, a recovery flowline extending from the header flowline to receive a portion of the composition, a three-phase gravity separator in fluid communication with the recovery flowline via a first flowline, and a hydrocarbon recovery vessel in fluid communication via a second flowline. A three-way control valve is arranged in the recovery flowline and actuatable between a first operational state, where the portion of the composition is entirely diverted through the first flowline and to the three-phase gravity separator, and a second operational state, where some of the portion of the composition is diverted also to the second flowline and to the hydrocarbon recovery vessel. The valve is actuated from the first to the second operational state when a flow rate through the first flowline reaches a predetermined maximum flow rate.
A gas plant hydrocarbon recovery management system, comprising:
A method, comprising:
Dependencies are inferred from the claim text.