AI/ML and blockchained based automated reservoir management platform
AssigneeLandmark Graphics Corporation
InventorsKeshava Prasad Rangarajan, Raja Vikram R. Pandya, Srinath Madasu, Shashi Dande
Life of this patent
Estimating the term…
Loading patent…
AssigneeLandmark Graphics Corporation
InventorsKeshava Prasad Rangarajan, Raja Vikram R. Pandya, Srinath Madasu, Shashi Dande
Estimating the term…
A system for managing well site operations comprising a well site operations module, a chain of blocks of a distributed network, and a sensor bank and control module. The operations module generates earth model variables using a physics model, well log variables or seismic variables, or both, and a trained AI/ML algorithmic model. The chain of blocks comprises a plurality of subsequent blocks. Each subsequent block comprises a well site entry and a hash value of a previous well site entry. A well site entry comprises transacted operation control variables. The well site operations module generates production operation control variables or development operation control variables from earth model variables. The well site entry can also include transacted earth model variables and sensor variables. The sensor bank and control module provides well log variables and the operations module couples control variables to the control module to control well site equipment.
A system for managing well site operations, the system comprising:
An apparatus for managing well site operations, the apparatus comprising:
A method for managing well site operations, the method comprising:
Dependencies are inferred from the claim text.