Scheduling system and method using a knowledge graph
AssigneeIndustrial Technology Research Institute
InventorsChung-Jen Chiu, Meng-Sung Wu, Tsan-Cheng Su, I-Hsiu Lee, Chung-Wei Lin
Life of this patent
Estimating the term…
Loading patent…
AssigneeIndustrial Technology Research Institute
InventorsChung-Jen Chiu, Meng-Sung Wu, Tsan-Cheng Su, I-Hsiu Lee, Chung-Wei Lin
Estimating the term…
A scheduling method using a knowledge graph (KG) performs following steps by a processor: obtaining an initial scheduling solution of the production system; converting the initial scheduling solution into triples to form the KG, each triples includes two entities and a relationship of the production system, the two entities indicate two production resources; embedding triples into a vector space to generate embedded vectors by a KG embedding technique; generating embedded vector combinations according to the embedded vectors and computing a distance of each of embedded vector combinations; and performing a scheduling algorithm to generate a target scheduling solution according to the embedded vector combinations, and providing reference information when the scheduling algorithm generates a schedule of a station, wherein the reference information comprises at least one of the embedded vector combinations associated with the station, and the distance corresponding to said at least one embedded vector combinations.
A scheduling method using a knowledge graph, which is applicable to a production system, wherein the production system comprises a plurality of machines performing production operations of a plurality of products, and the method comprises performing following steps by a processor:
A scheduling system using a knowledge graph, which is applicable to a plurality of products, with each of the plurality of products having a product part number and the scheduling system comprising:
Dependencies are inferred from the claim text.