Methods and devices for switching between frequency domain resources, and computer readable storage mediums
AssigneeBeijing Xiaomi Mobile Software Co., Ltd.
InventorYajun Zhu
Life of this patent
Estimating the term…
Abstract
The method includes: obtaining first information, which is for a terminal device to determine relevant information of switching between frequency domain resources, where the relevant information includes switching time and resource information after the switching, and the resource information after the switching includes a service beam identification after the switching and/or frequency domain resource information after the switching; and determining the relevant information of the switching between frequency domain resources according to the first information.
Claims14
A method for switching between frequency domain resources, performed by a terminal device, comprising:
- obtaining first information, which is for the terminal device to determine relevant information of switching between frequency domain resources, wherein the relevant information comprises switching time of the switching between frequency domain resources and resource information after the switching, and the resource information after the switching comprises at least one of a service beam identification after the switching or frequency domain resource information after the switching;
- and
- determining the relevant information of the switching between frequency domain resources according to the first information;
- wherein the first information comprises a first mapping relationship which is a corresponding relationship between multiple pieces of time information and multiple pieces of second information, each piece of time information comprises a time period, and each piece of second information comprises a service beam identification corresponding to a time period or frequency domain resource information corresponding to a time period;
- and
- wherein determining the relevant information of the switching between frequency domain resources according to the first information comprises:
- determining, according to the first mapping relationship, the switching time of the switching between frequency domain resources and the resource information after the switching corresponding to the switching time;
- wherein the method further comprises:
- obtaining a second mapping relationship, which is a corresponding relationship between the service beam identification and the frequency domain resource information;
- and
- wherein determining, according to the first mapping relationship, the switching time of the switching between frequency domain resources and the resource information after the switching corresponding to the switching time, comprises:
- determining, according to the first mapping relationship, the switching time and a service beam identification corresponding to the switching time;
- and determining frequency domain resource information corresponding to the determined service beam identification according to the determined service beam identification and the second mapping relationship;
- or
- determining, according to the first mapping relationship, the switching time and frequency domain resource information corresponding to the switching time;
- and determining a service beam identification corresponding to the determined frequency domain resource information according to the determined frequency domain resource information and the second mapping relationship.
A method for switching between frequency domain resources, performed by a network device, comprising:
- sending indication information of first information, wherein the first information is for a terminal device to determine relevant information of switching between frequency domain resources, the relevant information of the switching between frequency domain resources comprises switching time of the switching between frequency domain resources and resource information after the switching, and the resource information after the switching comprises at least one of a service beam identification after the switching or frequency domain resource information after the switching;
- wherein the first information comprises a first mapping relationship, wherein the first mapping relationship is for the terminal to determine the switching time of the switching between frequency domain resources and the resource information after the switching corresponding to the switching time, the first mapping relationship is a corresponding relationship between multiple pieces of time information and multiple pieces of second information, each piece of time information comprises a time period, and each piece of second information comprises a service beam identification corresponding to a time period or frequency domain resource information corresponding to a time period;
- wherein the method further comprises:
- sending indication information of a second mapping relationship, wherein the second mapping relationship is a corresponding relationship between the service beam identification and the frequency domain resource information, and the second mapping relationship is for the terminal device to determine frequency domain resource information corresponding to a determined service beam identification according to the determined service beam identification and the second mapping relationship, or to determine a service beam identification corresponding to a determined frequency domain resource information according to the determined frequency domain resource information and the second mapping relationship.
An electronic device, comprising a memory and a processor;
- wherein the memory is configured to store a computer program;
- and
- the processor is configured to run the computer program to perform:
- obtaining first information, which is for a terminal device to determine relevant information of switching between frequency domain resources, wherein the relevant information comprises switching time of the switching between frequency domain resources and resource information after the switching, and the resource information after the switching comprises at least one of a service beam identification after the switching or frequency domain resource information after the switching;
- and
- determining the relevant information of the switching between frequency domain resources according to the first information;
- wherein the first information comprises a first mapping relationship which is a corresponding relationship between multiple pieces of time information and multiple pieces of second information, each piece of time information comprises a time period, and each piece of second information comprises a service beam identification corresponding to a time period or frequency domain resource information corresponding to a time period;
- and
- wherein the processor is configured to run the computer program to perform:
- determining, according to the first mapping relationship, the switching time of the switching between frequency domain resources and the resource information after the switching corresponding to the switching time;
- wherein the processor is further configured to run the computer program to perform:
- obtaining a second mapping relationship, which is a corresponding relationship between the service beam identification and the frequency domain resource information;
- and
- wherein in a process of determining, according to the first mapping relationship, the switching time of the switching between frequency domain resources and the resource information after the switching corresponding to the switching time, the processor is configured to run the computer program to perform:
- determining, according to the first mapping relationship, the switching time and a service beam identification corresponding to the switching time;
- and determining frequency domain resource information corresponding to the determined service beam identification according to the determined service beam identification and the second mapping relationship;
- or
- determining, according to the first mapping relationship, the switching time and frequency domain resource information corresponding to the switching time;
- and determining a service beam identification corresponding to the determined frequency domain resource information according to the determined frequency domain resource information and the second mapping relationship.
Dependencies are inferred from the claim text.