Method and arrangement for carrying out construction measures
AssigneeBAUER Spezialtiefbau GmbH
InventorsMatthias Semel, Andreas Schober
Life of this patent
Estimating the term…
Loading patent…
AssigneeBAUER Spezialtiefbau GmbH
InventorsMatthias Semel, Andreas Schober
Estimating the term…
The invention relates to a method and an arrangement for carrying out construction measures, in particular foundation engineering measures, on a construction site with a number n of construction machines, in particular foundation engineering machines, on which attachment components, in particular construction tools, are fixed in a releasable and changing manner, wherein a number N of attachment components are kept on the construction site, wherein N>n>2. Provision is made in that in a computer unit the number n and the type of construction machines and the number N and the type of attachment components present on a construction site are saved, in that the computer unit has a data connection to the individual construction machines and queries information on the actuators of the individual construction machines, in that depending on the information received the computer unit ascertains which attachment component is fixed on the individual construction machine, and in that the computer unit ascertains and indicates which attachment components are freely available on the construction site.
A method for carrying out construction measures on a construction site, the method comprising:
Dependencies are inferred from the claim text.