Data confidence graphs
AssigneeDell Products L.P.
InventorsStephen J. Todd, Trevor Scott Conn
Life of this patent
Estimating the term…
Abstract
One example method includes, in a node of a data confidence fabric (DCF), the node comprising hardware, obtaining, when available, a static confidence score for a lowermost layer of an infrastructure of the node, after a workload is orchestrated to the node, obtaining, when available, a workload confidence score, when the static confidence score and the workload confidence score are available, aggregating the static confidence score and the workload confidence score together to obtain an overall infrastructure confidence score, and applying, by the node, the overall infrastructure confidence score to data passing through the node.
Claims16
A method, comprising:
- in a node of a data confidence fabric (DCF), the node comprising hardware, calculating, as the node is booted, a static confidence score for a lowermost layer of an infrastructure of the node;
- after a workload is orchestrated to the node, obtaining a workload confidence score that indicates a security of a development pipeline at a time when the workload was assembled in the development pipeline;
- aggregating, by the node, the static confidence score and the workload confidence score together to obtain an overall infrastructure confidence score;
- and
- applying, by the node, the overall infrastructure confidence score to data passing through the node.
A non-transitory storage medium having stored therein instructions that are executable by one or more hardware processors to perform operations comprising:
- in a node of a data confidence fabric (DCF), the node comprising hardware, calculating, as the node is booted, a static confidence score for a lowermost layer of an infrastructure of the node;
- after a workload is orchestrated to the node, obtaining a workload confidence score that indicates a security of a development pipeline at a time when the workload was assembled in the development pipeline;
- aggregating, by the node, the static confidence score and the workload confidence score together to obtain an overall infrastructure confidence score;
- and
- applying, by the node, the overall infrastructure confidence score to data passing through the node.
Dependencies are inferred from the claim text.