Mud logging of natural hydrogen
AssigneeSchlumberger Technology Corporation
InventorsDariusz Strapoc, Nicholas Ivars Abolins, Mahdi Ammar, Aleksandar Gligorijevic, Javier Suarez, Harry Fowlow
Life of this patent
Estimating the term…
Abstract
A method for estimating a quantity of natural hydrogen in a subterranean formation includes degassing drilling fluid obtained from a wellbore to obtain a gas sample including a quantity of hydrogen gas, measuring a concentration of hydrogen in the gas sample, and applying a correction to the measured concentration of hydrogen to estimate the quantity of natural hydrogen in the subterranean formation.
Claims19
A method for estimating a natural quantity of natural hydrogen in a subterranean formation, the method comprising:
- calibrating a mass spectrometer for making hydrogen measurements to obtain a calibrated mass spectrometer including a correlation between a measured hydrogen concentration and an actual hydrogen concentration;
- degassing drilling fluid obtained from a wellbore to obtain a gas sample including a sample quantity of hydrogen gas;
- measuring a sample concentration of sample hydrogen in the gas sample with the calibrated mass spectrometer;
- and
- applying a correction to the sample concentration of the sample hydrogen to estimate the natural quantity of the natural hydrogen in the subterranean formation.
A system for estimating a natural quantity of natural hydrogen in a subterranean formation, the system comprising:
- a degasser disposed to degas drilling fluid at a rig site to obtain a gas sample;
- a calibrated mass spectrometer configured to measure a sample concentration of hydrogen gas and a sample quantity of a second gas in the gas sample, wherein the calibrated mass spectrometer is calibrated for making calibrated hydrogen measurements based on a correlation between a measured hydrogen concentration and an actual hydrogen concentration;
- and
- a processor configured to evaluate the sample concentration of hydrogen gas and the sample quantity of the second gas and apply a correction to the measured concentration of hydrogen to estimate the natural quantity of the natural hydrogen in the subterranean formation.
A method comprising:
- calibrating a mass spectrometer for making hydrogen measurements to obtain a calibrated mass spectrometer including a correlation between a measured hydrogen concentration and an actual hydrogen concentration;
- obtaining a drilling fluid gas sample from a subterranean formation, the drilling fluid gas sample including a quantity of hydrogen gas;
- evaluating the drilling fluid gas sample to measure, using the calibrated mass spectrometer, a sample concentration of hydrogen gas and to measure a sample quantity of a second gas in the drilling fluid gas sample;
- correlating the sample quantity of the second gas with a quantity of drill bit metamorphism (DBM) hydrogen in the drilling fluid gas sample;
- and
- applying a correction to the sample concentration of the hydrogen gas by subtracting the quantity of DBM hydrogen from the sample concentration of hydrogen gas to compute a natural quantity of natural hydrogen in the subterranean formation.
Dependencies are inferred from the claim text.