Operation management system
AssigneeEneos Corporation
InventorsTadashi Seike, Hideshi Iki, Seiji Maeda
Life of this patent
Estimating the term…
Abstract
Provided is an operation management system configured to manage delivery of a raw material from a raw material production base where the raw material including a hydride is produced to a plurality of dehydrogenation bases where the raw material is subjected to a dehydrogenation reaction to obtain a hydrogen-containing gas. The operation management system includes: an information acquisition unit configured to acquire first information on a dehydrogenation status in the plurality of dehydrogenation bases; and a delivery plan creation unit configured to create a delivery plan for delivering the raw material to the plurality of dehydrogenation bases on the basis of the first information.
Claims8
An operation management system configured to manage delivery of a raw material from a raw material production base, where the raw material including a hydride is produced to a plurality of dehydrogenation bases, and where the raw material is subjected to a dehydrogenation reaction to obtain a hydrogen-containing gas, the operation management system comprising:
- an information acquisition unit configured to acquire first information on a dehydrogenation status in the plurality of dehydrogenation bases, and second information on a production status of the raw material in the raw material production base;
- a delivery plan creation unit configured to create a delivery plan for delivering the raw material to the plurality of dehydrogenation bases and returning and reusing dehydrogenated product generated to the raw material production base at least on the basis of the first information and the second information;
- and
- a transmitter configured to transmit the delivery plan to the raw material production base to adjust the production of the raw material, to instruct workers, via a display, of the delivery plan, and to deploy at least a tank lorry to at least one of the plurality of dehydrogenation bases based on the delivery plan,
- wherein the information acquisition unit is further configured to:
- acquire the first information on the dehydrogenation status in the plurality of dehydrogenation bases from a plurality of controllers, each controller provided at each of the plurality of dehydrogenation bases;
- and
- predict timings at which to supply the raw material to each of the plurality of dehydrogenation bases on a basis of a comparison between the first information and predetermined thresholds, the second information, and position information of each of the plurality of dehydrogenation bases, and
- wherein the first information is information from each of the controllers on at least a residual amount of the raw material used in the plurality of dehydrogenation bases, consumption of the raw material in a dehydrogenation device at each of the plurality of dehydrogenation bases, and an amount of the dehydrogenation product generated that can be recovered by the tank lorry and reused,
- wherein the residual amount of the raw material used in the plurality of dehydrogenation bases is determined by a liquid level meter, the consumption of the raw material in the dehydrogenation device at each of the plurality of dehydrogenation bases is determined by pressure meters positioned at least at a high-pressure accumulator and an intermediate-pressure accumulator, and the amount of the dehydrogenation product generated at the plurality of dehydrogenation bases is determined by a separate liquid level meter,
- wherein the timings are predicted and updated by acquiring the first information for a predetermined time period, and determining at least the amount of raw material consumed in the dehydrogenation device at each of the plurality of dehydrogenation bases and the amount of dehydrogenation product generated during the predetermined time period,
- wherein the predetermined thresholds are updated on a basis of a continuous monitoring of the amount of raw material consumed in the dehydrogenation device at each of the plurality of dehydrogenation bases and the amount of dehydrogenation product generated at each of the plurality of dehydrogenation bases, and
- wherein the production of the raw material is adjusted based on at least a determination of a residual amount of raw material at the raw material production base in combination with a signal from the controller at the at least one of the dehydrogenation bases indicating the amount of dehydrogenated product generated and subsequently supplied into the tank lorry for return and reuse.
An operation management device, comprising:
- at least a server, configured to:
- acquire first information on a dehydrogenation status in a plurality of dehydrogenation bases, and second information on a production status of raw material in a raw material production base, where the raw material including a hydride is produced to the plurality of dehydrogenation bases, and where the raw material is subjected to a dehydrogenation reaction to obtain a hydrogen-containing gas;
- create a delivery plan for delivering the raw material to the plurality of dehydrogenation bases and returning and reusing dehydrogenated product generated to the raw material production base at least on the basis of the first information and the second information;
- and
- transmit the delivery plan to the raw material production base to adjust the production of the raw material, to instruct workers, via a display, of the delivery plan, and to deploy at least a tank lorry to at least one of the plurality of dehydrogenation bases based on the delivery plan,
- wherein the server is further configured to:
- acquire the first information on the dehydrogenation status in the plurality of dehydrogenation bases from a plurality of controllers, each controller provided at each of the plurality of dehydrogenation bases;
- and
- predict timings at which to supply the raw material to each of the plurality of dehydrogenation bases on a basis of at least a comparison between the first information and predetermined thresholds, the second information, and position information of each of the plurality of dehydrogenation bases, and
- wherein the first information is information from each of the controllers on at least a residual amount of the raw material used in the plurality of dehydrogenation bases, consumption of the raw material in a dehydrogenation device at each of the plurality of dehydrogenation bases, and an amount of the dehydrogenation product generated that can be recovered by the tank lorry and reused,
- wherein the residual amount of the raw material used in the plurality of dehydrogenation bases is determined by a liquid level meter, the consumption of the raw material in the dehydrogenation device at each of the plurality of dehydrogenation bases is determined by pressure meters positioned at least at a high-pressure accumulator and an intermediate-pressure accumulator, and the amount of the dehydrogenation product generated at the plurality of dehydrogenation bases is determined by a separate liquid level meter,
- wherein the timings are predicted and updated by acquiring the first information for a predetermined time period, and determining at least the amount of raw material consumed in the dehydrogenation device at each of the plurality of dehydrogenation bases and the amount of dehydrogenation product generated during the predetermined time period,
- wherein the predetermined thresholds are updated on a basis of a continuous monitoring of the amount of raw material consumed in the dehydrogenation device at each of the plurality of dehydrogenation bases and the amount of dehydrogenation product generated at each of the plurality of dehydrogenation bases, and
- wherein the production of the raw material is adjusted based on at least a determination of a residual amount of raw material at the raw material production base in combination with a signal from the controller at the at least one of the dehydrogenation bases indicating the amount of dehydrogenated product generated and subsequently supplied into the tank lorry for return and reuse.
A method for managing delivery of a raw material from a raw material production base, where the raw material including a hydride is produced to a plurality of dehydrogenation bases, and where the raw material is subjected to a dehydrogenation reaction to obtain a hydrogen-containing gas, the method comprising:
- acquiring first information on a dehydrogenation status in the plurality of dehydrogenation bases, and second information on a production status of the raw material in the raw material production base;
- creating a delivery plan for delivering the raw material to the plurality of dehydrogenation bases and returning and reusing dehydrogenated product generated to the raw material production base at least on the basis of the first information and the second information;
- and
- transmitting the delivery plan to the raw material production base to adjust the production of the raw material, to instruct workers, via a display, of the delivery plan, and to deploy at least a tank lorry to at least one of the plurality of dehydrogenation bases based on the delivery plan,
- wherein the first information on the dehydrogenation status in the plurality of dehydrogenation bases is acquired from a plurality of controllers, each controller provided at each of the plurality of dehydrogenation bases,
- wherein timings are predicted at which to supply the raw material to each of the plurality of dehydrogenation bases on a basis of at least a comparison between the first information and predetermined thresholds, the second information, and position information of each of the plurality of dehydrogenation bases, and
- wherein the first information is information from each of the controllers on at least a residual amount of the raw material used in the plurality of dehydrogenation bases, consumption of the raw material in a dehydrogenation device at each of the plurality of dehydrogenation bases, and an amount of the dehydrogenation product generated that can be recovered by the tank lorry and reused,
- wherein the residual amount of the raw material used in the plurality of dehydrogenation bases is determined by a liquid level meter, the consumption of the raw material in the dehydrogenation device at each of the plurality of dehydrogenation bases is determined by pressure meters positioned at least at a high-pressure accumulator and an intermediate-pressure accumulator, and the amount of the dehydrogenation product generated at the plurality of dehydrogenation bases is determined by a separate liquid level meter,
- wherein the timings are predicted and updated by acquiring the first information for a predetermined time period, and determining at least the amount of raw material consumed in the dehydrogenation device at each of the plurality of dehydrogenation bases and the amount of dehydrogenation product generated during the predetermined time period,
- wherein the predetermined thresholds are updated on a basis of a continuous monitoring of the amount of raw material consumed in the dehydrogenation device at each of the plurality of dehydrogenation bases and the amount of dehydrogenation product generated at each of the plurality of dehydrogenation bases, and
- wherein the production of the raw material is adjusted based on at least a determination of a residual amount of raw material at the raw material production base in combination with a signal from the controller at the at least one of the dehydrogenation bases indicating the amount of dehydrogenated product generated and subsequently supplied into the tank lorry for return and reuse.
Dependencies are inferred from the claim text.