Process management device for visualizing production status
AssigneeMitsubishi Electric Corporation
InventorsHideaki Tashiro, Yoshiki Nakayama, Hidematsu Hayashi
Life of this patent
Estimating the term…
Loading patent…
AssigneeMitsubishi Electric Corporation
InventorsHideaki Tashiro, Yoshiki Nakayama, Hidematsu Hayashi
Estimating the term…
A process management device includes: a data input unit to input acquired information including operation data of a production facility as well as request instruction information; a control unit to output first display data of the work process management chart which includes work time lines showing work times by length and conveyance time lines showing conveyance times by inclination, both lines being arranged on the process management chart on the basis of the operation data, and serves as display data of the work process management chart, and when requested, to output second display data of the work process management chart obtained by visualizing the production status visualized by the first display data with a representation method of the work process management chart different from that of the work process management chart displayed based on the first display data; and a display unit to display the display data for outputting.
A process management device that visualizes a production status of a plurality of product pieces being manufactured through multiple work processes using a work process management chart of a two-dimensional coordinate system including a time axis representing work time in each work process and a process axis representing transition of the work processes, the process management device comprising:
A process management method that visualizes a production status of a plurality of product pieces being manufactured through multiple work processes using a work process management chart of a two-dimensional coordinate system including a time axis representing work time in each work process and a process axis representing transition of the work processes, the process management method comprising:
A non-transitory storage medium storing a program to make a computer execute processes for visualizing a production status of a plurality of product pieces being manufactured through multiple work processes using a work process management chart of a two-dimensional coordinate system including a time axis representing work time in each work process and a process axis representing transition of the work processes, the processes comprising:
Dependencies are inferred from the claim text.