Spatial multi-point synchronous closure construction method for a three-main-truss steel truss arch bridge
AssigneeChina Railway Construction Bridge Engineering Bureau Group Co., Ltd.
InventorsJian Zhao, Guannan Zhou, Lilong Fan, Luming An, Yanlong Ren, Weidong Cai, Baoliang Wang, Changhui Liu
Life of this patent
Estimating the term…
Abstract
A spatial multi-point synchronous closure construction method for a three-main-truss steel truss arch bridge. The method includes mounting standard rods, adjusting the standard rods to designed coordinates, observing coordinates and spacing of closure rods, processing and mounting the closure rods, adjusting spatial locations, monitoring the atmospheric temperature, analyzing a change rule, pushing the standard rods, adjusting gaps, and carrying out closure.
Claims10
A spatial multi-point synchronous closure construction method for a three-main-truss steel truss arch bridge, comprising the following steps:
- S1, setting up standard rods on side piers on both sides to form a closure opening between the standard rods on both sides, and adjusting free ends of the two standard rods at the closure opening to designed spatial coordinate locations;
- S2, relatively re-measuring spatial coordinates of the two standard rods at the closure opening and a closure opening spacing to obtain the closure opening spacing, and accurately positioning the two standard rods at the closure opening;
- S3, processing closure rods, and mounting a fine adjustment device on the free ends of the two standard rods at the closure opening;
- S4, mounting the closure rods on one of the standard rods at the closure opening, and adjusting the spatial positions of the closure rods;
- S5, monitoring an atmospheric temperature and obtaining a changing rule of the closure opening;
- S6, pushing the other one of the standard rods at the closure opening along a closure direction to form a closure gap;
- S7, finely adjusting the closure gap along the closure direction of the bridge with the fine adjustment device;
- and
- S8, fixing and closuring the closure rods with the two standard rods at the closure opening.
Dependencies are inferred from the claim text.