Train control system
AssigneeMitsubishi Electric Corporation
InventorDaisuke Koshino
Life of this patent
Estimating the term…
Loading patent…
AssigneeMitsubishi Electric Corporation
InventorDaisuke Koshino
Estimating the term…
A train control system includes a ground control device installed on a first route; a wireless base station connected to the ground control device; a ground control device installed on a second route that is adjacent to the first route; and a wireless base station connected to the ground control device. The ground control device performs handover reservation between with all the wireless base stations installed between a first station installed on the first route and a second station that is installed on the second route and is adjacent to the first station, and the ground control device transmits, to the ground control device, a handover reservation request between with all the wireless base stations disposed between the first station and the second station. The ground control device transmits, to the ground control device, a result of the handover reservation request between with all the wireless base stations.
A train control system for a train that travels on a route including a first route managed by a first railway operator and a second route that is adjacent to the first route and is managed by a second railway operator, the train control system comprising:
Dependencies are inferred from the claim text.