Burst datacenter capacity for hyperscale workloads
AssigneeOracle International Corporation
InventorsRoy Mehdi Zeighami, Craig Alderson Pennington
Life of this patent
Estimating the term…
Loading patent…
AssigneeOracle International Corporation
InventorsRoy Mehdi Zeighami, Craig Alderson Pennington
Estimating the term…
In some aspects, techniques may include monitoring a primary load of a datacenter and a reserve load of the datacenter. The primary load and reserve load can be monitored by a computing device. The primary load of the datacenter can be configured to be powered by one or more primary generator blocks having a primary capacity, and the reserve load of the datacenter can be configured to be powered by one or more reserve generator blocks having a reserve capacity. Also, the techniques may include detecting that the primary load of the datacenter exceeds the primary capacity. In addition, the techniques may include connecting the reserve generator blocks to at least one of the primary generator blocks and the primary load using a computing device switch.
A computer-implemented method comprising:
A system comprising:
A non-transitory computer-readable storage medium storing computer-executable program instructions, wherein when executed by a processing device, the computer-executable program instructions cause the processing device to perform operations comprising:
Dependencies are inferred from the claim text.