Train control system
AssigneeMitsubishi Electric Corporation
InventorsTakashi Miyauchi, Shingo Hamada, Takao Tanaka, Ryosuke Okada
Life of this patent
Estimating the term…
Loading patent…
AssigneeMitsubishi Electric Corporation
InventorsTakashi Miyauchi, Shingo Hamada, Takao Tanaka, Ryosuke Okada
Estimating the term…
A first on-board device installed on a first train controls an emergency brake unit. When it is determined that an actual deceleration value is insufficient in comparison with a predetermined emergency brake reference deceleration value, the first on-board device predicts a first stop location based on the actual deceleration value, and sends, to a ground control device, a first signal indicating insufficient deceleration and a first stop location signal representing the first stop location predicted. The ground control device sends the first signal and the first stop location signal to a second on-board device of a second train traveling ahead of the first train. The second on-board device invalidates a preset first run curve, over a range from a second train location representing an on-track location of the second train to a stop limit location of the second train, and generates a second run curve to control the second train.
A train control system comprising:
Dependencies are inferred from the claim text.