Self-hoisting crane and method of mounting and operating such crane
AssigneeLiftra IP Aps
InventorSimon Hedegaard
Life of this patent
Estimating the term…
Loading patent…
AssigneeLiftra IP Aps
InventorSimon Hedegaard
Estimating the term…
Self-hoisting crane (1) and method of mounting and operating such crane The self-hoisting crane is adapted to be hoisted from ground to a nacelle (2) or a tower (46) of a wind turbine (3) by operation of a cable winch (9) arranged at ground (10) and is adapted to be operated in its mounted position on the nacelle or on the tower by operation of the same cable winch. The cable extends from a hook block (6), out through a pedestal (4) of the crane, from the nacelle or from the tower and to the cable winch at the ground. The self-hoisting crane is provided with a cable crawler (11) having at least one motor driven traction sheave (122) adapted to, during operation of the self-hoisting crane, transfer a pulling force to the cable (8) through friction. The cable crawler is shiftable between an active state (13) in which the traction sheave may transfer a pulling force to the cable and a passive state in which the traction sheave may transfer no pulling force to the cable.
A self-hoisting crane adapted to be mounted on a nacelle or on a tower of a wind turbine, wherein the self-hoisting crane includes a pedestal, a boom arm, a hook block and at least one cable adapted to lift or lower the hook block in relation to the boom arm for operation of the self-hoisting crane in its mounted position on the nacelle or on the tower, wherein the at least one cable is adapted to extend from the hook block, out through the pedestal, from the nacelle or from the tower and to a cable winch arranged at the ground, wherein the self-hoisting crane is adapted to be hoisted from the ground to the nacelle or to the tower by operation of the cable winch arranged at the ground, and wherein the self-hoisting crane is adapted to be operated in its mounted position on the nacelle or on the tower by operation of the cable winch arranged at the ground, wherein the self-hoisting crane is provided with a cable crawler having at least one motor driven traction sheave adapted to, during operation of the self-hoisting crane in its mounted position on the nacelle or on the tower, transfer a pulling force to the at least one cable through friction, and in that the cable crawler is shiftable between an active state in which the traction sheave may transfer a pulling force or may transfer at least a substantial pulling force to the at least one cable and a passive state in which the traction sheave may transfer no pulling force or at least substantially no pulling force to the at least one cable.
A method of mounting and subsequently operating a self-hoisting crane on a nacelle or on a tower of a wind turbine, whereby the self-hoisting crane includes a pedestal, a boom arm, a hook block and at least one cable adapted to lift or lower the hook block in relation to the boom arm for operation of the self-hoisting crane in its mounted position on the nacelle or on the tower, whereby the at least one cable extends from the hook block, out through the pedestal, from the nacelle or from the tower and to a cable winch arranged at the ground, whereby the self-hoisting crane is hoisted from the ground to the nacelle or to the tower by operating the cable winch arranged at the ground, and whereby the self-hoisting crane is operated in its mounted position on the nacelle or on the tower by operating the cable winch arranged at the ground, wherein the self-hoisting crane is provided with a cable crawler having at least one motor driven traction sheave adapted to transfer a pulling force to the at least one cable through friction, in that the cable crawler is shiftable between an active state in which the traction sheave transfers a pulling force or an at least substantial pulling force to the at least one cable and a passive state in which the traction sheave transfers no or at least substantially no pulling force to the at least one cable, in that, when the self-hoisting crane is operated in its mounted position on the nacelle or on the tower without any or at least substantially without any external load attached to the hook block, the cable crawler is operated in its active state, and in that, when the self-hoisting crane is operated in its mounted position on the nacelle or on the tower with an at least substantial external load attached to the hook block, the cable crawler is operated in its passive state.