Completion system for CCS monitoring
AssigneeWelltec Manufacturing Center Completions ApS
InventorFabio Rosas Gutterres
Life of this patent
Estimating the term…
Loading patent…
AssigneeWelltec Manufacturing Center Completions ApS
InventorFabio Rosas Gutterres
Estimating the term…
A completion system for CO2 storage monitoring includes a first well tubular metal structure, a second well tubular metal structure, cement arranged between the borehole and a second part of the second well tubular metal structure, a monitoring line extending along the second well tubular metal structure and into the cement, a production packer assembly providing a seal between the first and second well tubular metal structures, the production packer assembly having an anchoring unit, and an annular barrier unit. Each unit comprises a tubular metal part configured to be mounted as part of a first part of the second well tubular metal structure, the tubular metal part having an expandable metal sleeve having a circumferential groove with an anchoring element and a sealing element. The monitoring line extends through the anchoring and annular barrier units between the tubular metal part and the expandable metal sleeve.
A completion system for CO2 storage monitoring in a reservoir in a formation, the completion system being arranged in a borehole having a top and extending towards the reservoir, the completion system comprising:
Dependencies are inferred from the claim text.