Lifting and reinforcing process for dust-free factory floor
AssigneeBeijing Hengxiang Hongye Foundation Reinforcement Technology Co., Ltd.
InventorTengyue Cui
Life of this patent
Estimating the term…
Loading patent…
AssigneeBeijing Hengxiang Hongye Foundation Reinforcement Technology Co., Ltd.
InventorTengyue Cui
Estimating the term…
Disclosed in the present invention is a lifting and reinforcing process for a dust-free factory floor, including: reinforcing a soft foundation and precisely lifting a settlement range. Reinforcing a soft foundation includes: step 1: determining a depth of a soft soil layer in an inner settlement area of the factory, and designing a drilling curve; step 2: drilling guiding holes from the outer construction point of the factory; step 3: connecting and communicating grouting channels; and step 4: grouting. Lifting a settlement area includes: step 1: determining a depth range between the reinforced soft foundation and the floor, and designing the drilling curve; step 2: drilling the guiding holes; step 3: connecting and communicating the grouting channels; step 4: starting grouting; and step 5: stopping grouting.
A lifting and reinforcing process for a dust-free factory floor, comprising:
Dependencies are inferred from the claim text.