Method for preventing sudden subsidence of open caisson in soft foundation
AssigneesChina Tiesiju Civil Engineering Group Co., Ltd., The Third Construction Co., Ltd. of Ctce Group
InventorsRui Yuan, Lin Qin, Gang Huang, Qianchao Yin, Hao Hong, Jianlong Yan
Life of this patent
Estimating the term…
Abstract
A method for preventing sudden subsidence of an open caisson in a soft foundation includes the following steps: a position of the open caisson is determined; grouting is carried out to reinforce a foundation of the open caisson; an open caisson manufacturing site is leveled; sections of the open caisson are manufactured and installed; the step of sections of the open caisson are manufactured and installed is repeated until all the sections are manufactured and the open caisson subsides in place as a whole.
Claims9
A method for preventing sudden subsidence of an open caisson in a soft foundation, comprising the following steps:
- S1, determining a position of the open caisson;
- S2, carrying out grouting to reinforce a foundation of the open caisson, and the foundation of the open caisson being located at a bottom of a wall of the open caisson;
- S3, levelling an open caisson manufacturing site;
- S4, manufacturing and installing sections of the open caisson, comprising:
- I, manufacturing sections of the open caisson, and fixedly installing bearing units on the inner sides of the upper parts of the sections;
- the bearing unit comprises a plurality of brackets and a frame, the brackets are fixedly installed on the inner side of the upper part of the section at uniform intervals, the frame is fixedly installed on the plurality of brackets, and a support is fixedly installed at the bottom of the frame;
- and a template is laid on the top of the frame;
- II, enabling the first section to subside;
- III, calculating the mass of the second section, placing a load with the same weight as the section on the bearing unit of the first section, and pre-pressing the first section for 24 h with the load;
- IV, if the first section has no obvious subsidence, taking out the load, and installing the second section by subsidence;
- and
- V, if the first section has subsidence, re-adjusting a construction solution;
- S5, repeating S4 until all the sections are manufactured and the open caisson subsides in place as a whole.