A method of preparing a first detonator support device to be charged in a borehole, the first detonator support device is configured for internally supporting a first elongated detonator unit, the first detonator support device exhibits an upper end and a lower end and comprises a first elongated sidewall hingedly coupled to a second elongated sidewall via a hinge member, a latching member of the first detonator support device is configured to secure the first elongated sidewall to the second elongated sidewall in a closed state, a first cord clamping surface of the first elongated sidewall is configured to come in position opposite a second cord clamping surface of the second elongated sidewall in said closed state for engagement with at least one cord member, an exterior of the first or second elongated sidewall is formed with a concave elongated recess extending along a prolongation of the first or second elongated sidewall, the concave elongated recess is configured to encompass a charging hose used for charging the borehole with the first detonator support device, the method comprising:
- providing the first detonator support device;
- preparing the first elongated detonator unit;
- mounting the first elongated detonator unit in the first detonator support device;
- positioning the cord member at the first or second cord clamping surface;
- and
- closing and latching the first detonator support device in said closed state.