Central plant optimization system with scalable asset models
AssigneeTyco Fire & Security GmbH
InventorsMatthew J. Asmus, Steven R. Vitullo, Steven C. Snyder
Life of this patent
Estimating the term…
Loading patent…
AssigneeTyco Fire & Security GmbH
InventorsMatthew J. Asmus, Steven R. Vitullo, Steven C. Snyder
Estimating the term…
A system includes processors configured to perform operations including obtaining a base design resource production of a building asset and a base resource production data set comprising a base resource production of the building asset at a plurality of operating points, calculating a scaled resource production data set comprising a scaled resource production of the building asset at the plurality of operating points by scaling the base resource production data set based on a new design resource production of the building asset relative to the base design resource production of the building asset, generating a resource consumption data set comprising a resource consumption of the building asset at the plurality of operating points based on the scaled resource production data set, and initiating an automated action based on the scaled resource production data set and the resource consumption data set.
A method comprising:
A system comprising:
A non-transitory computer-readable medium having instructions stored thereon that, when executed by one or more processors, cause the one or more processors to:
Dependencies are inferred from the claim text.