Load switching system and circuit
AssigneeSiliconBrite Technologies, Inc.
InventorsCameron Nathan Jackson, Baris Karagozlu
Life of this patent
Estimating the term…
Loading patent…
AssigneeSiliconBrite Technologies, Inc.
InventorsCameron Nathan Jackson, Baris Karagozlu
Estimating the term…
A load switching circuit includes a supply power availability (SPA) detector, a rail voltage detector, a swell detector, a surge detector, control logic, make and break timers, and a relay driver. The detectors detect various conditions, and generate signals in response to some detected conditions. The control logic is configured to: (1) release a relay within 300 ms after receiving a power-up signal; (2) start the make timer upon receiving a “rail voltage present” signal and wait for a first delay time, then operate the relay; (3) start the break timer upon receiving a “swell detected” signal to wait for a second delay time, then release the relay; (4) cause a shunt switch to conduct within 10 ms after receiving a “surge detected” signal; and (5) release the relay within 10 ms after receiving a “rail fail” signal.
A load switching circuit, comprising:
A load switching system, comprising:
Dependencies are inferred from the claim text.