Method for producing hypereutectoid steel rail resistant to contact fatigue
AssigneePangang Group Panzhihua Iron & Steel Research Institute Co., Ltd.
InventorsJun Yuan, Ming Zou, Yong Deng, Dawei Yang
Life of this patent
Estimating the term…
Loading patent…
AssigneePangang Group Panzhihua Iron & Steel Research Institute Co., Ltd.
InventorsJun Yuan, Ming Zou, Yong Deng, Dawei Yang
Estimating the term…
The present invention discloses a method for producing a hypereutectoid steel rail resistant to contact fatigue. The method includes performing molten iron desulphurization, converter smelting, LF refining, RH refining, continuous casting and billet heating, rolling and heat treatment after rolling to obtain a steel rail; the heat treatment after rolling includes performing accelerated cooling and air cooling on the center of a tread of a rail head, both sides of the rail head and the center of a rail bottom of the steel rail obtained after rolling, wherein the starting cooling temperature of the accelerated cooling is 650-900° C., the cooling rate is 1.0-5.0° C./s, and the final cooling temperature is 400-550° C.; and after reaching the final cooling temperature, the accelerated cooling is stopped and it is air-cooled to room temperature. The hypereutectoid steel rail has higher purity, better contact fatigue resistance and good wear resistance.
A method for producing a hypereutectoid steel rail resistant to contact fatigue, characterized in that the method comprises performing molten iron desulphurization, converter smelting, LF refining, RH refining, continuous casting and billet heating, rolling and heat treatment after rolling to obtain a steel rail;
Dependencies are inferred from the claim text.