Method of and system for in-situ creation of concrete arches
AssigneeBluCor Contracting, Inc.
InventorsGordon Antoine Bluth, Dustin Bluth, Lynden Bluth, Tyler Bluth, Colton Bluth
Life of this patent
Estimating the term…
Loading patent…
AssigneeBluCor Contracting, Inc.
InventorsGordon Antoine Bluth, Dustin Bluth, Lynden Bluth, Tyler Bluth, Colton Bluth
Estimating the term…
A method and structure for forming an elongated concrete arch involving a concrete sled to form a concrete tunnel extending behind the sled as the sled is moved forward. A series of arched forms are placed on the ground within the footprint of the sled, the sled is advanced forward over the arched forms as concrete is poured into a sled through a central passage into a space between the sled and the arched forms. The forms are guided and shaped as they enter the sled. The concrete is smoothed as it extends behind the sled. The arched forms are removed from beneath the concrete arch within 60 minutes of the concrete being poured.
A method for forming an elongated concrete arch, the method comprising:
A method for forming an elongated concrete arch, the method comprising:
A method for forming an elongated concrete structure, the method comprising:
Dependencies are inferred from the claim text.