Low cost dispatchable solar power
AssigneeRaygen Resources Pty Ltd
InventorsJohn Beavis Lasich, Richard James Payne, Sean Alexander Baker, Anthony John Kitchener
Life of this patent
Estimating the term…
Abstract
A method of operating a solar energy plant and a solar plant are disclosed. Thermal energy produced in the plant is used to heat a first volume of water and charge a hot store in the plant. Electricity produced in the plant operates a heat engine or other device, such as a refrigeration unit, to extract heat and consequently cool a second volume of water and charge a cold store. As desired, energy is transferred from the hot store to a heat engine and energy is transferred from the heat engine to the cold store to operate the heat engine to produce power in the plant.
Claims15
A method of operating a large scale solar energy plant that converts solar energy into electrical energy and thermal energy, the method including:
- (a) converting solar energy into thermal energy and heating a first volume of water to charge a hot store during an energy storage stage of the method, with the step including sourcing thermal energy from a coolant used to cool a solar cell receiver of the solar energy plant when the solar cell receiver is illuminated with sunlight;
- (b) converting solar energy into electrical energy and using the electrical energy to operate a first heat engine to cool a second volume of water and charge a cold store via heat exchange with a working fluid of the first heat engine that is in heat exchange relationship with the cold store during the energy storage stage of the method, with the first heat engine extracting heat from the second volume of water and exhausting heat to atmosphere;
- (c) using the hot store and the cold store to operate the first heat engine or a second heat engine to power an electrical generator during an energy discharge stage of the method, wherein step (c) includes:
- (i) using the hot store to transfer heat to the working fluid of at least one of the first heat engine or the second heat engine,
- (ii) transferring thermal energy from the working fluid and generating power in at least two power generation stages, and,
- (iii) using the cold store as a cold sink to extract heat from the working fluid;
- (d) recuperating heat energy from the working fluid in step (b) in at least two stages;
- and,
- (e) transferring recuperated heat energy to the working fluid in step (b) in at least two stages via a first recuperator and a second recuperator to enhance the performance of step (c), wherein the at least two stages include:
- (i) a first stage which comprises transferring heat to the working fluid via the first recuperator before the hot store transfers heat to the working fluid, and
- (ii) a second stage which comprises transferring heat to the working fluid, via the second recuperator and then the hot store, after thermal energy has been transferred from the working fluid to generate power in one power generation stage and before transferring thermal energy from the working fluid and generating power in a second power generation stage.
A large scale solar energy plant for producing electricity from solar energy that includes:
- (a) a solar power generation system for generating electricity and thermal energy;
- (b) a system for transferring thermal energy from the solar power generation system to heat a first volume of water and to charge a hot store;
- (c) a first heat engine for extracting heat from a second volume of water to charge a cold store during a charging period, with the first heat engine being configured to extract heat from the second volume of water and exhaust heat to atmosphere;
- (d) the first heat engine or a second heat engine connected to the hot store and the cold store for generating power during an energy discharge stage via at least two expanders;
- and,
- (e) at least two recuperators for recuperating heat energy from the first heat engine or the second heat engine and for transferring recuperated heat energy to the working fluid of the first heat engine or the second heat engine in at least two stages, with the at least two recuperators including:
- (i) a first recuperator for transferring heat to the working fluid before the hot store transfers heat to the working fluid, and
- (ii) a second recuperator for transferring heat to the working fluid after thermal energy has been transferred from the working fluid to generate power in a first expander of the at least two expanders and before transferring thermal energy from the working fluid and generating power in a second expander of the at least two expanders, wherein the hot store transfers heat to the working fluid after the second recuperator and before transferring thermal energy from the working fluid and generating power in the second expander.
Dependencies are inferred from the claim text.