Described herein are methods and systems for installing flooring systems that provide waterproofing or water-control capabilities. The flooring systems can utilize a gypsum material or any other self-leveling or concrete material along with a structural board or any other type of cement, wood, gypsum board, compressed board, cellulose fiberboard, sheathing board, or sheet metal material. The flooring systems include a waterproof coating applied to the structural boards to provide the water-control features. The waterproof coating covers seams between structural boards and between structural boards and the subfloor.
Claims20
A flooring system comprising:
- a plurality of wall isolation boards secured to a wall frame so that a bottom edge of each wall isolation board is adjacent to a subfloor;
- a plurality of floor isolation boards secured to a subfloor in a targeted area, the targeted area lying within a first portion of the subfloor adjacent to the plurality of wall isolation boards;
- a waterproof layer that covers each of (i) a perimeter edge of a second portion of the subfloor, (ii) the plurality of floor isolation boards, and (iii) an exposed, outward portion of the plurality of wall isolation boards;
- cementitious product poured in the second portion of the subfloor so that the poured cementitious product is level with a top side of the plurality of floor isolation boards such that the plurality of floor isolation boards define a pour stop for the poured cementitious product;
- and
- a sealant applied on top of the poured cementitious product such that the sealant covers intersection locations between the poured cementitious product and the isolation boards.
A method for installing a flooring system, the method comprising:
- securing a plurality of wall isolation boards to a wall frame so that a bottom edge of each wall isolation board is adjacent to a subfloor;
- securing a plurality of floor isolation boards to a subfloor in a targeted area, the targeted area lying within a first portion of the subfloor adjacent to the plurality of wall isolation boards;
- installing a waterproof layer that covers each of (i) a perimeter edge of a second portion of the subfloor, (ii) the plurality of floor isolation boards, and (iii) an exposed, outward portion of the plurality of wall isolation boards;
- pouring cementitious product in the second portion of the subfloor so that the poured cementitious product is level with a top side of the plurality of floor isolation boards such that the plurality of floor isolation boards define a pour stop for the poured cementitious product;
- and
- applying a sealant on top of the poured cementitious product such that the sealant covers intersection locations between the poured cementitious product and the isolation boards.
Dependencies are inferred from the claim text.