Model predictive maintenance system with event or condition based performance
AssigneeTyco Fire & Security GmbH
InventorsMohammad N. Elbsat, Michael J. Wenzel, Farhad Balali, Robert D. Turney
Life of this patent
Estimating the term…
Loading patent…
AssigneeTyco Fire & Security GmbH
InventorsMohammad N. Elbsat, Michael J. Wenzel, Farhad Balali, Robert D. Turney
Estimating the term…
A model predictive maintenance (MPM) system for building equipment includes one or more processing circuits including one or more processors and memory storing instructions that, when executed by the one or more processors, cause the one or more processors to perform operations. The operations include obtaining one or more performance indicators for the building equipment and determining whether a trigger condition has been satisfied based on the one or more performance indicators. The operations include triggering a model predictive maintenance process to generate a maintenance schedule for the building equipment in response to determining that the trigger condition has been satisfied. The operations include initiating a maintenance activity for the building equipment in accordance with the maintenance schedule.
A model predictive maintenance (MPM) system for building equipment, the MPM system comprising:
A method for determining optimal maintenance of building equipment, the method comprising:
A model predictive maintenance (MPM) controller for building equipment, the MPM controller comprising:
Dependencies are inferred from the claim text.