High level central plant optimization
AssigneeJohnson Controls Technology Company
InventorsMichael J. Wenzel, Robert D. Turney, Kirk H. Drees, Matthew J. Asmus
Life of this patent
Estimating the term…
Loading patent…
AssigneeJohnson Controls Technology Company
InventorsMichael J. Wenzel, Robert D. Turney, Kirk H. Drees, Matthew J. Asmus
Estimating the term…
A controller for equipment that operate to provide heating or cooling to a building or campus includes a processing circuit configured to obtain utility rate data indicating a price of resources consumed by the equipment to serve energy loads of the building or campus, obtain an objective function that expresses a total monetary cost of operating the equipment over an optimization period as a function of the utility rate data and an amount of the resources consumed by the equipment, determine a relationship between resource consumption and load production of the equipment, optimize the objective function over the optimization subject to a constraint based on the relationship between the resource consumption and the load production of the equipment to determine a distribution of the load production across the equipment, and operate the equipment to achieve the distribution.
A controller for equipment that operate to provide heating or cooling to a building or campus, the controller comprising:
A controller for equipment that operate to provide heating or cooling to a building or campus, the controller comprising:
A method for operating equipment to provide heating or cooling to a building or campus, the method comprising:
Dependencies are inferred from the claim text.