Back to results
US 12,215,889 B2Granted
Humidifier for a fan coil
AssigneeOmachron Intellectual Property Inc.
InventorsWayne Ernest Conrad, Scott Card
Life of this patent
Estimating the term…
Abstract
A method for operating a boiler of a humidification unit.
Claims20
A method for operating a boiler of a humidification unit, the boiler initially filled to a first water level, the method comprising:
- a) interrupting a normal operation of the humidification unit;
- and
- b) conducting, during the interruption, a flush cycle including:
- i) draining the boiler to substantially remove water from the boiler;
- ii) subsequently filling the boiler with water to a second water level, the second water level being greater than the first water level;
- iv) subsequently draining the boiler to substantially remove water from the boiler.
3 more elements
A method for performing a flush cycle of a boiler of a humidification unit, the boiler initially filled to a first water level, the method comprising:
- a) draining the boiler to substantially remove water from the boiler;
- b) subsequently filling the boiler with water to a second water level, the second water level being different from the first water level;
- c) subsequently draining the boiler to substantially remove water from the boiler;
- d) subsequently filling the boiler with water to the second water level;
- and
- e) subsequently draining the boiler to substantially remove water from the boiler.
3 more elements
A method for operating a boiler of a humidification unit, the boiler initially filled to a first water level, the method comprising:
- a) determining that an inactivity time of the boiler is greater than or equal to a predetermined inactivity time period;
- b) conducting, in response to the determination of step a), a flush and drain cycle such that the boiler is substantially empty in anticipation that the boiler will remain inactive for a relatively long period of time, the flush and drain cycle including:
- i) draining the boiler to substantially remove water from the boiler;
- ii) subsequently filling the boiler with water to a second water level;
- iii) subsequently draining the boiler to substantially remove water from the boiler;
- iv) subsequently filling the boiler with water to the second water level;
- and
- v) subsequently draining the boiler to substantially remove water from the boiler and leave the boiler in a substantially empty state;
- and
- c) storing the boiler in the substantially empty state.
7 more elements
Dependencies are inferred from the claim text.