# US 12,204,945 B1 · Noticed-based resource site curtailment

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 12,204,945 B1
- Document ID: US12204945B1
- Status: Granted
- Kind: B1
- Application number: 18/734,459
- Filed: 2024-06-05
- Published: 2025-01-16
- Granted: 2025-01-21
- Earliest claimed: 2023-07-10
- Assignees: Cipher Technology Inc.
- Applicants: Cipher Technology Inc.
- Inventors: Patrick A. Kelly; Bryan Keller; Reuben Govender; Samy Biyadi; Adam Ziskind
- Web page: https://patentgrep.com/patent/US12204945B1

## CPC

- G06F 1/26: Power supply means, e.g. regulation thereof (for memories G11C)
- G06F 9/505: {considering the load}
- G06Q 10/063: Operations research, analysis or management
- G06Q 30/0283: Price estimation or determination
- G06Q 50/50: Business processes related to the communications industry (charging, metering or billing arrangements specially adapted for data communications H04L12/14; telephonic communication involving automatic or semi-automatic exchanges H04M3/00; arrangements for metering, time-control or time indication H04M15/00; prepayment telephone systems H04M17/00; accounting or billing for wireless communication networks H04W4/24)
- G06Q 50/06: Energy or water supply
- G06Q 2220/00: Business processing using cryptography
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR

## Abstract

Systems and methods may include receiving real-time inputs associated with operational efficiency or profitability of a resource site. The systems and methods may analyze changes in the operational efficiency or profitability in real-time based on the inputs. Implementations may include dynamically determining an operational value optimization for the site, where the operational value optimization may include a profitability analysis based on power cost and revenue generated from compute operations. Moreover, implementations may include determining whether a notice to curtail site operations is received from an external party, and if so, curtailing operations of the resource site accordingly. Also, implementations may include prior to receiving such a notice from a third party, performing real-time controls of power consumption or compute load at the site based on the profitability analysis, where the real-time controls may include at least temporarily curtailing or modifying site power usage.

## Claims

### Claim 1

A computer-implemented method, comprising:
receiving a plurality of inputs in real-time associated with at least one of operational efficiency or profitability of a resource site;
applying a defined logic to the plurality of inputs, wherein the logic analyzes changes in the at least one of operational efficiency or profitability of the resource site in real-time based on the plurality of inputs;
dynamically determining an operational value optimization for the resource site based on the defined logic, wherein the operational value optimization comprises a profitability analysis based on a cost of power of the resource site and revenue generated from resource site compute operations;
determining whether a notice to curtail operations of the resource site is received from an external party, and upon receipt of the notice, curtailing operations of the resource site in accordance with the notice; and
prior to receiving a notice to curtail operations of the resource site from a third party, performing real-time controls of power consumption or compute load at the resource site based on the profitability analysis, wherein the real-time controls comprise at least temporarily curtailing or modifying power usage of the resource site.

### Claim 2 (depends on 1)

The computer-implemented method of claim 1, wherein the profitability analysis comprises determining a magnitude of the revenue generated from resource site compute operations relative to a power purchase price and a power sale price plus a down buffer.

### Claim 3 (depends on 2)

The computer-implemented method of claim 2, wherein the down buffer is set using a stochastic model on cost to curtail resource site compute operations and predictions of power and market volatility.

### Claim 4 (depends on 1)

The computer-implemented method of claim 1, wherein the external party comprises a grid operator, and further comprising monetizing ancillary services through curtailment of operations of the resource site based on a request of the grid operator.

### Claim 5 (depends on 1)

The computer-implemented method of claim 1, wherein an option to deliver the notice to curtail operations of the resource site is sold to the external party.

### Claim 6 (depends on 1)

The computer-implemented method of claim 1, wherein the notice to curtail operations of the resource site comprises an emergency notice from the third party to curtail operations.

### Claim 7 (depends on 1)

The computer-implemented method of claim 1, wherein temporarily curtailing or modifying the power usage comprises at least partially curtailing or modifying a compute load of the resource site.

### Claim 8 (depends on 1)

The computer-implemented method of claim 1, wherein modifying the power usage of the resource site comprises modifying a compute load of the resource site.

### Claim 9 (depends on 1)

The computer-implemented method of claim 1, wherein application of the defined logic includes at least one of real-time training, implementation, or calibration of one or more models associated with profitability of the resource site using the plurality of inputs.

### Claim 10 (depends on 9)

The computer-implemented method of claim 9, wherein the one or more models comprise at least one of discrete, stochastic, statistical, machine learning (ML), or artificial intelligence (AI) models.

### Claim 11 (depends on 9)

The computer-implemented method of claim 9, further providing real-time improvements and model calibrations related to the at least one of operational efficiency or profitability, in response to continuous feedback from the resource site.

### Claim 12 (depends on 9)

The computer-implemented method of claim 9, wherein power supplied to the resource site comprises one or more renewable or intermittent power sources, and at least one of the models predicts availability of power generated by the one or more renewable or intermittent power sources to dynamically determine the operational value optimization for the resource site.

### Claim 13 (depends on 9)

The computer-implemented method of claim 9, wherein the resource site is associated with a front-of-meter (FOM) site, a behind-the-meter (BTM) site, or a hybrid site, and the defined logic is re-configurable corresponding to each of the FOM site, the BTM site, and the hybrid site.

### Claim 14 (depends on 9)

The computer-implemented method of claim 9, wherein the real-time controls comprise one or more of: fully curtailing power usage or compute load at the resource site, partially curtailing power usage or compute load at the resource site, fully restoring power or compute load at the resource site, or partially restoring power or compute load at the resource site.

### Claim 15 (depends on 14)

The computer-implemented method of claim 14, wherein the defined logic analyzes costs associated with fully curtailing power usage or compute load at the resource site or fully restoring power or compute load at the resource site to dynamically determine the operational value optimization.

### Claim 16 (depends on 1)

The computer-implemented method of claim 1, wherein the real-time controls adjust one or more of operation and infrastructure components of the resource site to operate in accordance with the dynamically determined operational value optimization.

### Claim 17 (depends on 1)

The computer-implemented method of claim 1, wherein the real-time controls adjust operation of the resource site in real-time and successive controls are performed having negligible delay.

### Claim 18

A computer system, comprising:
one or more processors; and
a memory having instructions stored thereon, which when executed by the one or more processors cause at least one of the one or more processors to perform operations of:
receiving a plurality of inputs in real-time associated with at least one of operational efficiency or profitability of a resource site;
dynamically determining in real-time an operational value optimization for the resource site based on the plurality of inputs, wherein the operational value optimization comprises at least one of an operational efficiency analysis or a profitability analysis based on a cost of power of the resource site and revenue generated from resource site compute operations;
determining whether a notice to curtail operations of the resource site is received from an external party, and upon receipt of the notice, curtailing operations of the resource site based on the notice; and
prior to receiving a notice to curtail operations of the resource site from a third party, performing real-time controls of power consumption or compute load at the resource site in accordance with at least one of the operational efficiency analysis or the profitability analysis, wherein the real-time controls comprise at least temporarily curtailing or modifying power usage or compute load of the resource site.

### Claim 19 (depends on 18)

The computer system of claim 18, wherein the profitability analysis comprises determining a magnitude of the revenue generated from resource site compute operations relative to a power purchase price and a power sale price plus at least one of an up buffer or a down buffer.

### Claim 20 (depends on 19)

The computer system of claim 19, wherein the at least one of an up buffer or a down buffer is set using a model on cost to curtail resource site compute operations and predictions of power and market volatility.

### Claim 21 (depends on 18)

The computer system of claim 18, wherein the external party comprises an entity with authority to issue curtailment notices and further comprising monetizing flexibility of the resource site through curtailment of operations of the resource site based on a request of the external party.

### Claim 22 (depends on 18)

The computer system of claim 18, wherein an option to deliver the notice to curtail operations of the resource site is sold to the external party.

### Claim 23 (depends on 18)

The computer system of claim 18, wherein the notice to curtail operations of the resource site comprises an emergency notice from the third party to curtail operations.

### Claim 24 (depends on 18)

The computer system of claim 18, wherein temporarily curtailing or modifying the power usage comprises at least partially curtailing or modifying the compute load of the resource site.

### Claim 25 (depends on 24)

The computer system of claim 24, wherein a financial impact associated with temporarily curtailing or modifying the compute load comprises revenue captured by selling at least a portion of curtailed power usage at the resource site.

### Claim 26 (depends on 18)

The computer system of claim 18, wherein a financial impact associated with temporarily curtailing or modifying the power usage or the compute load comprises a cost associated with curtailing the power usage and an expected financial effect of changes in power prices.

### Claim 27 (depends on 18)

The computer system of claim 18, wherein a financial impact associated with temporarily curtailing or modifying the power usage or the compute load comprises a change in profitability associated with curtailing the power usage or the compute load at the resource site.

### Claim 28 (depends on 18)

The computer system of claim 18, wherein a financial impact associated with temporarily curtailing or modifying the power usage or the compute load comprises a change in profitability associated with curtailing the power usage or the compute load at the resource site during a projected duration of a peak of power cost.

### Claim 29 (depends on 18)

The computer system of claim 18, wherein the financial impact associated with temporarily curtailing or modifying the power usage or the compute load comprises revenue captured by selling at least a portion of curtailed power usage or the compute load at the resource site.

### Claim 30 (depends on 18)

The computer system of claim 18, wherein a financial impact associated with temporarily curtailing or modifying the power usage or the compute load comprises revenue captured by selling at least a portion of curtailed power usage or the compute load at the resource site during a projected duration of a peak of power cost.