Method to control the cooldown of main heat exchangers in liquefied natural gas plant
AssigneeHoneywell Lng LLC
InventorsBo Jin, Matthew Joseph Okasinski, Fei Chen
Life of this patent
Estimating the term…
Abstract
A method to control the cooldown of main heat exchangers in liquefied natural gas plant. The method provides for the automated control of a flow rate of a natural gas feed stream through a heat exchanger based on one or more process variables and set points. The flow rate of refrigerant streams through the heat exchanger is controlled by different process variables and set points, and is controlled independently of the flow rate of the natural gas feed stream.
Claims13
A method for controlling start-up of a heat exchange system having a main heat exchanger comprising a warm end, a cold end, and an intermediate zone, at least one feed stream, and at least one refrigerant stream, the method comprising the steps of:
- (a) cooling the main heat exchanger from a first temperature profile at a first time to a second temperature profile at a second time, the first temperature profile having a first average temperature that is greater than a second average temperature of the second temperature profile;
- and
- (b) executing the following steps, in parallel during the performance of step (a):
- (i) measuring a cold end temperature at the cold end of the main heat exchanger;
- (ii) calculating a first value comprising a rate of change of the first cold end temperature;
- (iii) providing a cold end set point representing a preferred rate of change of the cold end temperature;
- (iv) controlling a flow rate of the at least one feed stream through the main heat exchanger based on the first value and the cold end set point;
- (v) measuring a first intermediate zone temperature at a first location in the intermediate zone of the main heat exchanger;
- (vi) calculating a second value comprising a rate of change of the first intermediate zone temperature;
- (vii) providing a first intermediate zone set point representing a preferred rate of change of the first intermediate zone temperature;
- and
- (viii) controlling a flow rate of a first stream of the at least one refrigerant stream through the main heat exchanger based on the second value and the first intermediate zone set point.