# US 12,120,607 B2 · Power control method and apparatus, and device

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 12,120,607 B2
- Document ID: US12120607B2
- Status: Granted
- Kind: B2
- Application number: 17/697,251
- Filed: 2022-03-17
- Published: 2022-06-30
- Granted: 2024-10-15
- Earliest claimed: 2019-09-20
- Assignees: Huawei Technologies Co., Ltd.
- Applicants: Huawei Technologies Co., Ltd.
- Inventors: Zhenghu Ding; Yongmei Zeng; Jiang Zhu
- Web page: https://patentgrep.com/patent/US12120607B2

## CPC

- H04W 52/0206: {in access points, e.g. base stations}
- G06F 1/3209: Monitoring remote activity, e.g. over telephone lines or network connections
- H04W 52/0216: {using a pre-established activity schedule, e.g. traffic indication frame}
- H04W 52/0258: {controlling an operation mode according to history or models of usage information, e.g. activity schedule or time of day}
- Y02D 30/70: in wireless communication networks
- H04W: WIRELESS COMMUNICATION NETWORKS (broadcast communication H04H; communication systems using wireless links for non-selective communication, e.g. wireless extensions H04M1/72)
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)
- Y02D: CLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE

## Abstract

A power control method and apparatus, and a device. The method includes: determining, by a network device, whether there is to-be-received uplink data in a first scheduling period on a first receive channel; and in response to determining that there is no to-be-received uplink data in the first scheduling period on the first receive channel, controlling, by the network device, a state of the first receive channel in the first scheduling period to be an off state. This reduces power consumption of the network device.

## Claims

### Claim 1

A power control method, comprising:
determining, by a network device, whether there is a to-be-received uplink data in a first scheduling period on a first receive channel; and
in response to determining that the to-be-received uplink data is not in the first scheduling period on the first receive channel, controlling, by the network device, a state of the first receive channel in the first scheduling period to be an off state, wherein
the first receive channel comprises a receive end and a low noise amplifier, and the controlling, by the network device, the state of the first receive channel in the first scheduling period to be the off state comprises:
before the first scheduling period starts, controlling, by the network device, the receive end and/or the low noise amplifier to be turned off.

### Claim 2 (depends on 1)

The method according to claim 1, wherein the controlling, by the network device, the state of the first receive channel in the first scheduling period to be the off state comprises:
before the first scheduling period starts, controlling, by the network device, the receive end and the low noise amplifier to be turned off.

### Claim 3 (depends on 1)

The method according to claim 1, wherein the network device is a baseband unit (BBU), and the controlling, by the network device, the receive end and/or the low noise amplifier to be turned off comprises:
sending, by the BBU, first information to a processing chip, wherein the first information is used to indicate the processing chip to turn off the receive end and/or the low noise amplifier; or
sending, by the BBU, second information to the receive end and/or the low noise amplifier, wherein the second information is used to indicate the receive end and/or the low noise amplifier to the off state.

### Claim 4 (depends on 1)

The method according to claim 1, before the determining, by the network device, whether there is the to-be-received uplink data in the first scheduling period on the first receive channel, further comprising:
performing, by the network device, aggregation scheduling on the to-be-received uplink data that is on the first receive channel, wherein the aggregation scheduling is used to schedule uplink data that is in at least one scheduling period to another scheduling period.

### Claim 5 (depends on 4)

The method according to claim 4, wherein the first receive channel corresponds to a single carrier, and the performing, by the network device, the aggregation scheduling on the to-be-received uplink data that is on the first receive channel comprises:
determining, by the network device, whether first uplink data in a second scheduling period on the single carrier is allowed to be delayed to a third scheduling period; and
in response to the first uplink data in the second scheduling period on the single carrier is allowed to be delayed to the third scheduling period, scheduling, by the network device, the first uplink data to the third scheduling period, wherein the third scheduling period follows the second scheduling period.

### Claim 6 (depends on 5)

The method according to claim 5, wherein:
determining that a to-be-received first uplink data in the second scheduling period on the single carrier is allowed to be delayed to the third scheduling period in response to the following conditions being met:
a service priority corresponding to the first uplink data is less than or equal to a preset service priority;
in response to there being an initial transmission bearer in the first uplink data, a priority of the initial transmission bearer is less than or equal to a preset bearer priority;
a delay of the first uplink data relative to the third scheduling period is less than or equal to a preset delay; and
a sum of a quantity of resources occupied by the first uplink data and a quantity of resources occupied by uplink data that is in the third scheduling period on the single carrier is less than or equal to a preset resource quantity.

### Claim 7 (depends on 5)

The method according to claim 5, wherein
the third scheduling period is adjacent to the second scheduling period; or
there is to-be-received second uplink data in the third scheduling period.

### Claim 8 (depends on 4)

The method according to claim 4, wherein the first receive channel corresponds to at least two carriers, and the performing, by the network device, the aggregation scheduling on the to-be-received uplink data corresponding to the first receive channel comprises:
performing, by the network device, the aggregation scheduling on uplink data that corresponds to at least one of the at least two carriers, wherein the aggregation scheduling is used to schedule uplink data that is in different scheduling periods on the at least two carriers to a same scheduling period.

### Claim 9 (depends on 8)

The method according to claim 8, wherein the performing, by the network device, the aggregation scheduling on uplink data that corresponds to at least one of the at least two carriers comprises:
in response to uplink data that is in a fourth scheduling period on carriers in a first carrier set is allowed to be delayed by one scheduling period, scheduling the uplink data that is in the fourth scheduling period on the carriers in the first carrier set to a scheduling period next to the fourth scheduling period, wherein
the first carrier set comprises carriers that are of the at least two carriers and on which there is the uplink data in the fourth scheduling period.

### Claim 10 (depends on 9)

The method according to claim 9, wherein:
the uplink data that is in the fourth scheduling period on the carriers in the first carrier set is scheduled to the scheduling period next to the fourth scheduling period in response to the following conditions being met:
service priorities corresponding to the uplink data that is in the fourth scheduling period on the carriers in the first carrier set are less than or equal to a preset service priority;
in response to the first carrier set has a carrier on which the uplink data in the fourth scheduling period has an initial transmission bearer, a priority of the initial transmission bearer is less than or equal to a preset bearer priority;
delays, relative to the fourth scheduling period, of the uplink data that is in the fourth scheduling period on the carriers in the first carrier set are less than or equal to a preset delay; and
a sum of a quantity of resources occupied by the uplink data that is in the fourth scheduling period on the carriers in the first carrier set, and a quantity of resources occupied by uplink data that is in the scheduling period next to the fourth scheduling period on the at least two carriers is less than or equal to a preset resource quantity.

### Claim 11 (depends on 1)

The method according to claim 1, wherein the first receive channel corresponds to at least two carriers, and invalid scheduling periods corresponding to the at least two carriers are in same time domain positions, wherein the invalid scheduling period is a scheduling period in which uplink data transmission is not performed.

### Claim 12 (depends on 1)

The method according to claim 1, wherein the first receive channel corresponds to at least two carriers, and when scheduling periods corresponding to the at least two carriers are of different duration, the method further comprises:
updating duration of a scheduling period of at least one of the at least two carriers, wherein the updated duration of the scheduling periods corresponding to the at least two carriers is the same.

### Claim 13

A power control apparatus in a network device, comprising:
a processor; and
a memory coupled to the processor, the memory comprising instructions that, when executed by the processor, cause the power control apparatus to:
determine whether there is a to-be-received uplink data in a first scheduling period on a first receive channel; and
in response to the power control apparatus determining the to-be-received uplink data is not in the first scheduling period on the first receive channel, control a state of the first receive channel in the first scheduling period to be an off state, wherein
the first receive channel comprises a receive end and a low noise amplifier, and the instructions, when executed by the processor, cause the power control apparatus to:
before the first scheduling period starts, control the receive end and/or the low noise amplifier to be turned off.

### Claim 14 (depends on 13)

The power control apparatus according to claim 13, wherein the instructions, when executed by the processor, cause the power control apparatus to:
before the first scheduling period starts, control the receive end and the low noise amplifier to be turned off.

### Claim 15 (depends on 13)

The power control apparatus according to claim 13, wherein the network device is a baseband unit (BBU), and the instructions, when executed by the processor, cause the power control apparatus to:
send first information to a processing chip, wherein the first information is used to indicate the processing chip to turn off the receive end and/or the low noise amplifier; or
send second information to the receive end and/or the low noise amplifier, wherein the second information is used to indicate the receive end and/or the low noise amplifier to the off state.

### Claim 16 (depends on 13)

The power control apparatus according to claim 13, wherein the instructions, when executed by the processor, cause the power control apparatus to:
before the power control apparatus determines whether the to-be-received uplink data is in the first scheduling period on the first receive channel, perform aggregation scheduling on the to-be-received uplink data that is on the first receive channel, wherein the aggregation scheduling is used to schedule uplink data that is in at least one scheduling period to another scheduling period.

### Claim 17 (depends on 16)

The power control apparatus according to claim 16, wherein the first receive channel corresponds to a single carrier, and the instructions, when executed by the processor, cause the power control apparatus to:
determine whether first uplink data in a second scheduling period on the single carrier is allowed to be delayed to a third scheduling period; and
in response to the first uplink data in the second scheduling period on the single carrier is allowed to be delayed to the third scheduling period, schedule the first uplink data to the third scheduling period, wherein the third scheduling period follows the second scheduling period.

### Claim 18 (depends on 16)

The power control apparatus according to claim 16, wherein the first receive channel corresponds to at least two carriers, and the instructions, when executed by the processor, cause the power control apparatus to:
perform the aggregation scheduling on uplink data that corresponds to at least one of the at least two carriers, wherein the aggregation scheduling is used to schedule uplink data that is in different scheduling periods on the at least two carriers to a same scheduling period.

### Claim 19 (depends on 18)

The power control apparatus according to claim 18, wherein the instructions, when executed by the processor, cause the power control apparatus to:
in response to uplink data that is in a fourth scheduling period on carriers in a first carrier set is allowed to be delayed by one scheduling period, schedule the uplink data that is in the fourth scheduling period on the carriers in the first carrier set to a scheduling period next to the fourth scheduling period, wherein
the first carrier set comprises carriers that are of the at least two carriers and on which there is the uplink data in the fourth scheduling period.

### Claim 20

A computer-readable storage medium configured to store instructions that in response to the instructions being executed by a computer or processor, cause the computer or the processor to implement a power control method, the method comprising:
determining, by a network device, whether there is a to-be-received uplink data in a first scheduling period on a first receive channel; and
in response to determining that the to-be-received uplink data is not in the first scheduling period on the first receive channel, controlling, by the network device, a state of the first receive channel in the first scheduling period to be an off state, wherein
the first receive channel comprises a receive end and a low noise amplifier, and the controlling, by the network device, the state of the first receive channel in the first scheduling period to be the off state comprises:
before the first scheduling period starts, controlling, by the network device, the receive end and/or the low noise amplifier to be turned off.
